Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 30, 2025 at 7:00 PM
Updated December 31, 2025
Renovation of a fire / police facility in Groton, Connecticut. Completed plans call for the renovation of a one-story above grade fire / police facility.
Installation of a new single wall stainless steel chimney extension, onto an existing clay tile and brick masonry chimney. To include the installation of six (6) guy wires on the extended chimney. Bids must be enclosed in a sealed envelope and designated as bid for “POLICE DEPARTMENT CHIMNEY EXTENSION”. Any bid may be withdrawn prior to the above scheduled time for opening of bids. Any bid received after the time and date specified will be returned unopened. Each bidder must deposit, with his bid, security in the form of bid bond or certified check subject to the conditions provided in the Information for Bidders. No bidder may withdraw his bid within 60 days after the actual date of the opening thereof. The Town of Groton reserves the right to waive any formalities or to reject any or all bids. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Award
Fire / Police
$85,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 20, 2025
January 5, 2026
To be determined, Groton, CT
Related To This Project
Groton, CT
Bid Date: Dec 01 2025
Groton, CT
Bid Date: Jan 08 2026
Groton, CT
Bid Date: Jan 23 2026
Groton, CT
Bid Date: Jan 28 2026
Groton, CT
--
Groton, CT
Bid Date: Jan 08 2026
Groton, CT
Bid Date: Jan 08 2026
Groton, CT
Bid Date: Jan 23 2026
Groton, CT
Bid Date: Oct 28 2025
Groton, CT
Bid Date: Nov 13 2025
Groton, CT
Bid Date: Nov 06 2025
Groton, CT
Bid Date: Sep 30 2025
Groton, CT
Bid Date: Oct 02 2025
Groton, CT
Bid Date: Sep 09 2025
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
