Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 31, 2025 at 8:00 PM
Updated November 1, 2025
Demolition, site work and paving for a mixed-use development in Joliet, Illinois. Conceptual plans call for the demolition of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; water / sewer project; sidewalk / parking lot; and sidewalk / parking lot.
Phase III engineering services are required to provide construction engineering services for above mentioned project. Work includes, but is not limited to, the realignment and reconstruction of the mainline and interchange pavement and related roadway elements, including ramp and crossroad reconstruction, existing bridge removal, installation of an enclosed storm sewer system with drainage structures and detention ponds, earth excavation and embankment grading, installation of retaining and noise walls, barrier and moment slab construction, bridge replacement, roadway lighting, traffic signals, ITS implementation, erosion and sediment control, landscaping, traffic control and protection, detour routing, pavement marking and signing, sidewalk, shared used path, and other related roadway items required to complete the project as indicated in the contract documentation, all incidental and collateral work necessary to complete the project. Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The anticipated construction completion date is October 31, 2028 plus 10 working days. The Consultant must complete and submit final measurements, calculations, and final contract records documents to the department no later than six (6) weeks after the completion of the project. The Prime firm must be prequalified in the Special Services (Construction Inspection) category to be considered for this project. Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). ILDOT - 6 - RFQ Engineering - I-80 at IL 53 (Chicago St) Interchange, Phase III Project
Conceptual
Roads / Highways
$5,000,000.00
Public - State/Provincial
Demolition, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 20, 2026
I-80 & Chicago St, Joliet, IL
Related To This Project
Joliet, IL
Bid Date: Dec 09 2025
Joliet, IL
Bid Date: Dec 11 2025
Joliet, IL
Bid Date: Dec 10 2025
Joliet, IL
Bid Date: Dec 09 2025
Joliet, IL
Bid Date: Dec 11 2025
Joliet, IL
Bid Date: Dec 09 2025
Joliet, IL
Bid Date: Dec 10 2025
Joliet, IL
Bid Date: Nov 19 2025
Joliet, IL
Bid Date: Dec 03 2025
Joliet, IL
Bid Date: Dec 04 2025
Joliet, IL
Bid Date: Dec 02 2025
Joliet, IL
Bid Date: Dec 02 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
