BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 19, 2025 at 7:00 PM

Updated December 20, 2025

Renovation of a multi-residential development in Newport News, Virginia. Completed plans call for the renovation of a multi-residential development.

**As of December 19, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** Proposals will be accepted for ITB # MCFP2P-11-25 Marshall Courts Façade Phase II Project. Proposals are to be submitted to the Newport News Redevelopment and Housing Authority Division of Purchasing. Documents may be downloaded from the specified website. Question Deadline 11/26/2025 All questions and requests for clarification or additional information, must be addressed in writing via email to mwarren@nnrha.org SCOPE OF SERVICES: EQUIPMENT Needed. o High Lift for Hazardous electrical o Contractor to provide dumpster and removal service to clean upjob site 2. CARPENTY GUTTER AND DOWN SPOUT - ELECTRICAL WORK REQUIREMENTS o Ifdown spouts are removed the Contractor has to reinstall as soon as possible SIDING-HARDIPLANK REMOVE AND REPLACE PHASE (2) A, BUILDINGS (68 SO FT) Prepare surface by removing nails, repairing sheathing, applying house-wrap to strictly to manufacturer's specifications. Install 1" x 8 %" Hardiplank lap siding to the surface using hot-dipped galvanized nails or stainless-steel nails driven at least 1" into studs. Staggerjoints hi adjacent pieces and center all butt joints over studs. Either installjoints with a 3 mm gap filled with Hardiplank caulking compound or butt together withoutjointing compound. In this second option install a piece ofPVC sheeting behind joint. Where Hardiplank butts up against an accessory fill joint with a 6 mm fillet ofHariplnak caulking. REPLACE AS NEEDED PVC TRIM ON FRONT AND BACK PORCH TO TRIM OUT SIDING AS NEEDED. TUCCO-PATCH PHASE (2) A. BUILDINGS (800 SO FT) Remove damaged stucco and wire, attach new wire to patch area and apply scratch, brown and color coats. Feather patch into the surrounding surface. Match existing color as closely as possible SIDING -HARJDPLANK REMOVE AND REPLACE PHASE (2),B. BUILDINGS (35 SO FT) o Prepare surface by removing nails, repairing sheathing, applying house-wrap strictly to manufacturer's specifications. Install 1" x 8 %" Hardiplank lap siding to the surface using hot-dipped galvanized nails or stainless-steel nails driven at least 1" into studs. Staggerjoints in adjacent pieces and center all buttjoints over studs. Either installjoints with a 3 mm gap filled with Hardiplank caulking compound or butt together withoutjointing compound. IN this second option install apiece ofPVC sheeting behindjoint. Where Hardiplank butts up against an accessory fill joint with a 6 mm fillet ofHardiplank caulking. REPLACE AS NEEDED PVC TRIM ON FRONT AND BACK PORCH TO TRIM OUT SIDING AS NEEDED. STUCCO-PATCH PHASE (2) A. BUILDINGS (800 SO FT) Remove damaged stucco and wire, attach new wire to patch area and apply scratch, brown and color coats. Feather patch into the surrounding surface. Match existing color as closely as possible SIDING -HARJDPLANK REMOVE AND REPLACE PHASE (2),B. BUILDINGS (35 SO FT) o Prepare surface by removing nails, repairing sheathing, applying house-wrap strictly to manufacturer's specifications. Install 1" x 8 %" Hardiplank lap siding to the surface using hot-dipped galvanized nails or stainless-steel nails driven at least 1" into studs. Staggerjoints in adjacent pieces and center all buttjoints over studs. Either installjoints with a 3 mm gap filled with Hardiplank caulking compound or butt together withoutjointing compound. IN this second option install apiece ofPVC sheeting behindjoint. Where Hardiplank butts up against an accessory fill joint with a 6 mm fillet ofHardiplank caulking INSTALL AS NEEDED A 1X2 PVC TRIM ON FRONT PORCH GABLE ENDS TO TRIM OUT SIDING. STUCCO-PATCH PHASE (2) B, BUILDINGS (800 SO FT) Remove damaged stucco and wire, attach new wire to patch area and apply scratch, brown and color coats. Feather patch into the surrounding surface. Match existing color as closely as possible. SIDING-HARDIPLANK REMOVE AND REPLACE AS NEEDED-Phase 2 D-2, D-3 BUILDINGS (25 SO FT) Prepare surface by removing nails, repairing sheathing, applying house-wrap strictly to manufacturer's specifications. Install 1" x 8 %" Hardiplank lap siding to the surface using hot-dipped galvanized nails or stainless-steel nails driven at least 1" into studs. Staggerjoints in adjacent pieces and center all buttjoints over studs. Either installjoints with a 3 mm gap filled with Hardiplank caulking compound or butt together withoutjointing compound. In this second option install a piece ofPVC sheeting behindjoint. Where Hardiplank butts up against an accessory filljoint with a 6 mm fillet ofHardiplank caulking ENVIRONMENTAL REHAB COMMERCIAL WASH EJ.F.S SIDING ON PHASE (2) A. BUILDINGS (23.5000 SO FT) Chemical wash all stucco/EIFS siding with low presser. The Contractor is to clean all porches, steps and brick work on each building. COMMERCIAL WAS E.I.F.S SIDING ON PHASE (2) B. BUILDINGS (19.850 SO FT) Chemical wash all EIFS and siding with low presser. Power wash all brick work at bottom ofsiding area and cement porches and steps COMMERCIAL CHEMICAL WASH SIDING LOW PRESSER (12.800 SOFT) Chemical washy all siding trim. The brick work on some ofthe buildings will also be cleaned at the bottom ofthe unitsjust below the siding. Clean out all .gutters and down spouts ELECTRICAL (CSI) - SPECIAL ELECTRIC COVER (8) MAIN LINES OVER HEAD FOR SAFETY Due to safety concerns to replace the gutters and trim on all Phase(I) A & B building the main wire had to be covered 12' from the building an allowance to complete the scope of work, subcontractor's general requirements. Remove and reinstall all exterior lights on all Marshall Court building. Reinstall cable boxes on exterior of all buildings ifthey are removed by the contractor. PAINT AND WALLPAPER PREP AND PAINT EXTERIOR FIFS SIDING, DOORS AND TRIM WORK Building A-23,560 SQFT Cover ground with drop cloth. Scrape all loose, cracked, peeling and blistered paint from siding. Feather edges and dull gloss with sandpaper. Dispose ofchips properly. Caulk and fill holes. One coat Primer and two coats ofpaint on siding, trim, doors and rails with owner's choice ofpremixed acrylic latex. BuildingB-19,850 SQFT Cover ground with drop cloth. Scrape all loose, cracked, peeling and blistered paint from siding. Feather edges and dull gloss with sandpaper. Dispose ofchips properly. Caulk and fill holes. One coat Primer and two coats ofpaint on siding, trim, doors and rails with owner's choice ofpremixed acrylic latex. Building D-2, D-3-12,800 SQ FT Cover ground with drop cloth. Scrape all loose, cracked, peeling and blistered paint from siding. Feather edges and dull gloss with sandpaper. Dispose ofchips properly. Caulk and fill holes. One coat Primer and two coats ofpaint on siding, trim, doors and rails with owner's choice ofpremixed acrylic latex.

Post-Bid

Multi-Residential

$5,000,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
189
Active Projects
84
Bidding Soon
1,257
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 12, 2025

January 5, 2026

Project location map

227 27th St, Newport News, VA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.