BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 8, 2025 at 7:00 PM

Updated December 9, 2025

Site work for a residential development in Berkeley, California. Completed plans call for site work for a residential development.

This project entails the design and installation of the underground site electrical and communications systems, the installation of the site lighting system, and the completion of the electrical systems for five (5) modular cottage foundations on CITY owned land at 22 Barrows Street. Each of the five cottages will consist of two prefabricated modules supplied and installed by Preferred Building Systems of Claremont, NH, providing approximately 900 square feet of finished living space. Attics will be inaccessible, and basements will be left unfinished for future CITY completion. CITY staff, supported by an experienced project manager, will act as the general CONTRACTOR. The CITY will directly contract with all other sub-CONTRACTORs (foundations, mechanical, finish carpentry, etc.). Both CITY personnel and the project manager have substantial experience with modular construction. The CITY is initiating the CONTRACTOR selection process now, but will not authorize the work to proceed to construction until after CITY Council approval, which is anticipated in January 2026. The CITY reserves the right to cancel the project at any time and for any reason. Question Deadline 11/25/2025 at 3:00 PM PT Should a BIDDER find discrepancies in or omissions from the Contract Documents or is in doubt as to their meaning, the BIDDER should at once notify the CITY Work is expected to commence in the late spring of 2026 and be completed by the end of September 2026. Substantial Completion August 28, 2026 Final Completion and Acceptance September 25, 2026 General. In addition to the scope of work described in the plans, specifications, and general conditions documents, the electrical contractor (CONTRACTOR) shall be responsible for the: o Design and installation of a temporary electrical service for the job site, and removal of the same when the temporary service is no longer needed. o Design and installation of underground site electrical and communications conduit and cabling and electrical meters and disconnects. o Completion of the individual cottage interior electrical and communications systems installed by the modular unit manufacturer. Basement Electrical. The CONTRACTOR shall install supply and install: 1. Basement stairwell lighting. 2. (6) overhead light fixtures in the unfinished basement area, locations to be determined. 3. (4) duplex receptacles in the unfinished basement area, locations to be determine. 4. Power and service switches to all mechanical equipment supplied and installed by others: a. Water heater b. Radon fan

Bid Results

Residential Subdivision

$171,450.00

Public - City

Site Work

44

11

45

5

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
501
Active Projects
210
Bidding Soon
3,011
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 8, 2025

June 22, 2026

Project location map

Barrows Street, Berkeley, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.