BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 4, 2026 at 7:00 PM

Updated March 5, 2026

Site work and paving for a mixed-use development in Winston, Oregon. Completed plans call for site work for a water / sewer project; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Contractor shall complete all Work as specified or indicated in the Contract Documents. The Work is generally described as follows: Furnish all labor, equipment, and materials as required for the Inverted Sewer Siphon Project project consisting of the construction and placement of new gravity sanitary sewer, manholes, inverted sewer siphon and structures, water service, level 3 HMAC paving, and all associated improvements. Question Deadline 01/22/2026 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Questions received less than seven days prior to the date for opening of Bids may not be answered. Furnish all labor, equipment, and materials as required for the Inverted Sewer Siphon Project project consisting of the construction and placement of new gravity sanitary sewer, manholes, inverted sewer siphon and structures, water service, level 3 HMAC paving, and all associated improvements. Pre-Qualification: Yes CGS Project No. 21116

Award

Water / Sewer

$2,793,199.00

Public - City

Paving, Site Work

33

23

10

7

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
64
Active Projects
27
Bidding Soon
219
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 29, 2026

March 2, 2026

Project location map

Helweg Rd, Winston, OR


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.