BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 8, 2025 at 7:00 PM

Updated December 10, 2025

Demolition, site work, paving and new construction of a bridge / tunnel in Salinas, California. Conceptual plans call for site work for a bridge / tunnel; for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; and for paving for a bridge / tunnel.

Final Date to Submit Questions: 08/01/2026, 15:00:00 The method of Contractor Selection has not been Determined at this time. Request for Proposal for Design Services is Underway

Conceptual

Bridges / Tunnels

$2,612,000.00

Public - County

Demolition, New Construction, Paving, Site Work

4

10

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
248
Active Projects
120
Bidding Soon
1,943
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 22, 2027

Project location map

Boronda Rd, Salinas, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.