BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 25, 2026 at 8:00 PM

Updated July 7, 2026

Site work and paving for a mixed-use development in Salinas, California. Design plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

As of June 25, 2026, an engineer has been selected for the project. A firm timeline for construction has not been established. *The closed solicitation has been included below for reference: This Phase 2 project includes widening and intersection improvements of approximately 1.1 miles of East Boronda Road between just east of McKinnon Street and about 700 feet east of Natividad Road intersection, including new multi-lane roundabouts at the intersections of El Dorado Drive and Boronda Road, and Natividad Road and Boronda Road. Work also includes but is not limited to: the design of storm water treatment facilities and bioretention facilities, shared-use paths, bike lanes, bus pullouts, street lighting, sidewalks, ADA pedestrian access ramps, storm drain system, sanitary sewer mainline extension, pavement delineation, roadway signs, landscaping, and all other improvements and requirements as necessary, including utility coordination. Phase 2 consists of providing design and engineering services of two standalone projects, phases 2A and 2B to be designed, bid, and constructed as standalone projects. Phase 2A project starts from the prior four-lane widened section east of McKinnon through the El Dorado Drive intersection to be improved as a multi-lane roundabout then transition back to the existing roadway cross section east of El Dorado Drive. Phase 2B project will begin from the prior four-lane widened section east of El Dorado Drive through the Natividad Road intersection to be improved as a multi-lane roundabout then transition back to the existing roadway cross section east of Natividad Road. Question Deadline 01/06/2026 at 4:00 PM PT Online Q&A : Yes The method of Contractor Selection has not been Determined at this time. Request for Proposal for design services is underway

Design

Roads / Highways

$300,000.00

Public - City

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
274
Active Projects
83
Bidding Soon
1,830
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 15, 2027

Project location map

E Boronda Rd, Salinas, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.