BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 12, 2026 at 7:00 PM

Updated February 13, 2026

Site work and new construction of a water / sewer project in Salinas, California. Conceptual plans call for site work for a water / sewer project; and for the construction of a water / sewer project.

The scope of work for this project is based on a preliminary project description prepared in the 2023 sanitary sewer master plan prepared by wallace group. The scope of work includes taking the project concept through 100% design and construction by fall of 2028. The scope of work includes the following: new triplex lift station to meet a future average daily flow and peak hour dry weather flow are 3,800 gpm and 11,900 gpm, respectively project team will need to work with wallace group acting as a city representative to confirm downstream collection system impacts new wet well with 60 minutes of response time at future peak flows new force main(s) new supervisory control and data acquisition (scada) platform: instrumentation, communication facilities, and controls abandonment of the existing lift station and force mains The anticipated milestones include the following: 10% conceptual plan and preliminary engineering report Topographic and boundary survey Geotechnical engineering Subsurface utility exploration 30% preliminary design, validation of project site constraints and owner's budget Value engineering Lifecycle cost analysis Construction scheduling Easement and/or rights of way acquisition, if required Ceqa compliance Permitting Early equipment procurement 60% plans, specifications, and estimate 90% plans, specifications, and estimate 100% plans, specifications, and estimate Construction Project commissioning Project acceptance and testing Warranty bonds Extended warranty period License Requirements Class "A" Estimated Bid Value $15M - $20M *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Question Deadline 01/30/2026 at 5:00 PM PT Online Q&A :Yes.

Conceptual

Water / Sewer

$20,000,000.00

Public - City

New Construction, Site Work

53

7

2

5

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
62
Active Projects
3
Bidding Soon
806
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 13, 2026

October 13, 2026

Project location map

Lake Street, Salinas, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.