BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 10, 2026 at 7:00 PM

Updated January 11, 2026

Demolition, site work and new construction of a water / sewer project in Mount Pleasant Mills, Pennsylvania. Completed plans call for the construction of a one-story above grade water / sewer project; and one-story above grade water / sewer project.

The project consists of the construction of a new 0.1 mgd package Wastewater Treatment Plant including but not limited to influent vault and metering, headworks and screen, SBR treatment concrete tanks and equipment, UV disinfection, blowers, yard piping, new electrical service, duct banks, new process control and blower building, demolition of existing treatment plant and existing electrical, and all associated appurtenances. Prospective bidders should download bidding documents from the designated website and are encouraged to register as plan holders. All further requirements regarding bid submittal, qualifications, procedures, and contract award are detailed in the Instructions to Bidders included in the bidding documents. The Perry Township Municipal Authority reserves the right to reject any or all bids or parts thereof or items therein, waive any defects or irregularities, and accept any bid that serves its best interest. Bids shall remain open for a period of sixty days from the date of bid opening unless delayed by required approvals, bond sales, or grant awards. All RFIsshall be submitted through PennBid unlessthe Contractor hasreceived a hard copy of the bidding documents. For contractors who have received a hard copy, please contact Alli Muzzy, JHA Environmental Project Assistant, amuzzy@jhacompanies.com, (570) 407- 7028 with RFIs 12-31-2025 5:00 PM This Contract is to be: Contract No. 2025-WW2 - New Wastewater Treatment Plant The Work to be completed under this Contract consists of furnishing all plant, labor, materials, etc. and performing all work as necessary and/or required to complete Scope of the Contract for Perry Township Municipal Authority's New Wastewater Treatment Plant and Sewer Extension, as set forth on the Drawings and in accordance with these Specifications and Project Manual. The Work to be completed includes, but is not limited to, the following general items: 1. All site work, excavation protection (as required), earthwork, embankment, trench excavation, backfill, demolition, roadways, site piping, erosion and sedimentation control plans, paving, walkways, curbs, fencing, etc., as specified in Division 2 of these Specifications and shown on the Drawings. 2. Contractor is responsible for removal, testing (if required) and disposal of all residual sewage waste materials within the existing treatment tanks and pump stations that are to be demolished and/or renovated. All material shall be disposed of at an approved landfill or disposal facility. Costs to be paid under the cash allowance. See Section 00300: Bid Form. 3. All cast-in-place reinforced concrete and pre-cast concrete work as shown on the Drawings and specified in Division 3 of these Specifications. This work shall include all concrete equipment and housekeeping pads for equipment provided under this contract, along with miscellaneous site concrete. 4. All foundation, substructure, superstructure, structural and buildingarchitectural work as shown on the Drawings and as specified in Divisions 3, 4, 5, 6, 7, and 8 of these Specifications. 5. All related surface preparation and painting work specified in Division 9 of these Specifications and as shown on the Drawings. 6. All building specialties and as specified in Division 10 of these Specifications and shown on the Drawings. 7. All process treatment systems, mechanical process equipment, safety equipment, and laboratory equipment as specified in Division 11 of these Specifications and shown on the Drawings. 8. All equipment conveying systems, furnishings and supplies, as specified in Divisions 11, 13 and 15 of these Specifications and as shown on the Drawings. 9. All process and mechanical piping systems along with all piping system appurtenances as specified in Divisions 11 and 15 of these Specifications and as shown on the Drawings. 10. All other piping systems not specifically indicated on the Drawings or specified herein shall conform with Divisions 11 and 15 of these Specifications.

Bid Results

Water / Sewer

$2,930,938.00

Public - County

Demolition, New Construction, Site Work

39

45

86

5

Subscribe For Documents

88 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
60
Active Projects
6
Bidding Soon
1,049
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 9, 2026

March 10, 2026

Project location map

To be determined, Mount Pleasant Mills, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.