BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 27, 2026 at 7:00 PM

Updated January 28, 2026

Demolition, site work and addition to a water / sewer project in Chatham, Massachusetts. Completed plans call for the addition of a one-story above grade water / sewer project; and for the demolition of a water / sewer project.

The project generally consists of the installation of a 79-foot long pile supported concrete pedestrian walkway addition along the southern end of the South Jog at the Chatham Fish Pier. The work includes demolition of an existing gangway platform, construction of a new reinforced concrete pedestrian walkway supported by treated timber piles and a combination of stainless steel and fiberglass reinforced plastic structural members, installation of a timber whale and timber chock fender system, reinstallation of the existing gangway assembly onto the new walkway, and construction of a handrail along the walkway. Additionally, a 19-foot long concrete foundation wall will extend the southern wall of the South Jog landward, and a Tensar Marine Mattress will be installed at the base. An additional pile and mounting assembly will be installed to support a jib crane. Other tasks include excavation and backfill, walkway area painting, repair of a washed out section of the asphalt parking lot, and installation of additional guardrail. Bids must be accompanied by a bid deposit equal to 5% of the bid value, and the successful bidder must provide a 100% Faithful Performance Bond and a Labor and Materials Payment Bond for at least 50% of the contract price. Bidders must observe employment condition requirements and prevailing wage rates for the project. The project is located on 45 Barcliff Avenue Ext. in Chatham, Massachusetts. Each bid to be in accordance with the plans, specifications, and other Contract Documents, now on file at the office of the Engineer, Foth Infrastructure & Environment, LLC (Foth), located at 15 Creek Road, Marion, MA 02738, where they may be examined. Any questions pertaining to the plans, specifications, or any of the Contract Documents shall be submitted in writing to Beth Schuh at: beth.schuh@foth.com. To be given consideration, every question must be received by DECEMBER 18, 2025, at 5:00 P.M. (local time).

Award

Water / Sewer

$596,445.00

Public - City

Addition, Demolition, Site Work

9

18

2

4

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 7, 2026

February 23, 2026

Project location map

45 Barcliff Ave, Chatham, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.