BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 19, 2025 at 7:00 PM

Updated December 20, 2025

Site work and paving for a road / highway in Norfolk, Nebraska. Completed plans call for site work for a road / highway.

Illuminate the River Point District, Norfolk NE – 2025 project includes the installation of approximately 2000 LF of Festoon lighting from 3rd Street and Norfolk Avenue to 3rd Street and Braasch Avenue to 2nd Street and Braasch Avenue to connect with the Geary Pedestrian Bridge. This includes the construction of footings and installation of approximately 14 roadway poles for the festoon lighting along the aforementioned roadways. Additionally, at the intersections of 5th, 4th, 3rd, and 2nd and Norfolk Avenue, Catenary lighting will be utilized at each intersection, with approximately 36 light fixtures. This Bid includes providing power to all lighting fixtures runs. To submit a bid, all bidders must be registered on Sam.Gov. Civic Community Center Financing Fund (CCCFF) grant dollars are being utilized for this project. Pre-qualification: Required

GC Bidding

Roads / Highways

$400,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
79
Active Projects
40
Bidding Soon
551
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 12, 2026

February 26, 2026

Project location map

To Be Determined, Norfolk, NE

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.