BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 31, 2026 at 8:00 PM

Updated April 1, 2026

Renovation of a mixed-use development in Norco, California. Completed plans call for the renovation of a fire / police facility; and municipal facility.

Project Address: 2870 Clark Avenue, Norco, CA 92860 Each Proposer is Hereby Notified of a Mandatory Pre-proposal Meeting on Thursday, March 19, 2026, at 10 a.m. The Location of the Pre-proposal Meeting Will Be at Norco City Hall - 2870 Clark Avenue, Norco, Ca 92860. Proposers Not Attending This Meeting Will Be Disqualified as Non-responsive. Proposals by Contractors/consultants That Do Not Attend This Mandatory Pre-proposal Meeting Will Not Be Considered. Project Address: 2870 Clark Avenue, Norco, Ca 92860 the Project Aims to Deliver a Reliable, Code-compliant Service Entrance Configuration and Integrate Emergency Power to Ensure Operational Continuity for City Hall and the Police Department. The Work Includes Reconfiguring Electrical Distribution to Clearly Separate Emergency and Non-emergency Loads, Achieving Selective Coordination, and Updating Arc-flash Hazard Labeling. To Minimize Disruption, All Work Will Be Performed on Weekends Only, Supported by a Temporary Generator Rated at 40 Kw or Larger to Maintain Power for Critical Systems. The Contractor Will Be Responsible for Administering All Permits, Scheduling Inspections, and Coordinating With Southern California Edison (Sce), the City of Norco, and the Corona-norco Unified School District as Needed. Comprehensive Testing, Training, and Documentation-including Accurate as-built Drawings and Full Closeout Submittals-are Required. Online Q&A Deadline 03/23/2026 10:16 AM (PDT) The Scope of Work Includes Disconnecting Existing Conductors to the Automatic Transfer Switch (Ats), Installing New Copper Bussing, Removing and Replacing Bussing Between Sections of the Main Service, and Providing New Circuit Breakers and Conductors to Reconfigure Sections One and Two. Emergency and Non-emergency Circuits Will Be Relocated Accordingly, and Labeling Will Be Updated to Clearly Identify "generator Power Only." Approximately Three Z-bars Will Be Replaced as Part of Bussing Modifications. Special Conditions Include Maintaining Critical Operations, Limiting Work to Weekends, Completing the Project Within 45 Working Days, Adhering to Security Protocols, Prevailing Wage Requirements, and Dir Registration All Work Shall Comply With the California Electrical Code (Nfpa 70), Nfpa 110, Ieee Standards, Cal/osha Requirements, Southern California Edison Service Standards, and City of Norco Permitting Processes. The Contractor Must Procure All Materials Prior to Starting Work and Maintain the Electrical Room in a Clean, Accessible Condition Throughout the Project. The Contractor Must Certify Material Readiness Before Mobilization and Ensure Site Safety, Including Electrical Room Cleanliness and Accessibility. There Are 45 Working Days Allowed to Complete the Construction Portion of This Project. Liquidated Damages Shall Be Assessed at $1,000.00 Per Working Day.

Bid Results

Municipal

$131,271.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
152
Active Projects
1
Bidding Soon
1,789
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 30, 2026

April 29, 2026

Project location map

2870 Clark Ave, Norco, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.