BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 24, 2026 at 7:00 PM

Updated January 31, 2026

Renovation of an educational facility in Golden, Colorado. Completed plans call for the renovation of a educational facility.

Reference Number 0000409101 Bid Intent Not Available Estimated Project Cost: $2,600,000 This solicitation is for the Mines Recreation Center HVAC replacement design planning for a multi-year phased replacement of end-of-life equipment. The Mines REC Center, a 76,500 square foot facility, originally built in 2006, has five HVAC zones with 372 tons of capacity, humidification and ventilation requirements for sports arenas, and a competition pool facility. The initial phase 1 design will be for the Lockridge Arena zone 2 with 138 tons capacity that has direct and indirect evaporative cooling and humidification. Structural engineering will be required for evaluation of weights for new equipment, snow loads, solar panel loads, and event lighting suspended below the roof of Lockridge Arena. Future phases are planned to replace HVAC systems in other zones across the building as funding is available to proceed with design that will require design teams to include Mechanical, Electrical, and Structural engineering for each phase. The design teams pre-qualified in this solicitation process will also be pre-qualified and eligible for future phases as they are funded. The Colorado School of Mines anticipates using a Design / Bid / Build (DBB) approach to project delivery. The Architect/Engineer is expected to provide Basic Services as described in the sample Architect/Engineer Agreement and Terms and Conditions of the Contract. Question Deadline 01/26/2026 at 2:00 PM MT Questions are submitted online No, Questions and requests for clarification regarding this project shall be submitted before the deadline listed in the above Schedule. Communication regarding the project during the procurement, outside of this submission process or scheduled procurement milestones, is not permitted. POINT OF CONTACT/CLARIFICATION Name: Sheri Atencio-Church & Sam Traylor Agency: Colorado School of Mines Email Address: satenciochurch@mines.edu; sam.traylor@mines.edu Phone: 303-273-3615 Buyer Preferences, Guidelines & Requirements General Requirements - Bidder Prequalification/Preregistration Required - Insurance Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Labor and Materials Bond 100 % Anticipated Construction Start/Finish July 2026 / September 2026 Phase 1 The State reserves the right to reject any or all submittals on the basis of being unresponsive to this RFQ or for failure to disclose requested information.

Post-Bid

Educational

$2,600,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
291
Active Projects
127
Bidding Soon
1,270
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 30, 2026

July 1, 2026

Project location map

1651 Elm St, Golden, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.