Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 12, 2026 at 7:00 PM
Updated February 13, 2026
Site work and new construction of a water / sewer project in Salinas, California. Conceptual plans call for site work for a water / sewer project; and for the construction of a water / sewer project.
The scope of work for this project is based on a preliminary project description prepared in the 2023 sanitary sewer master plan prepared by wallace group. The scope of work includes taking the project concept through 100% design and construction by fall of 2028. The scope of work includes the following: new triplex lift station to meet a future average daily flow and peak hour dry weather flow are 3,800 gpm and 11,900 gpm, respectively project team will need to work with wallace group acting as a city representative to confirm downstream collection system impacts new wet well with 60 minutes of response time at future peak flows new force main(s) new supervisory control and data acquisition (scada) platform: instrumentation, communication facilities, and controls abandonment of the existing lift station and force mains The anticipated milestones include the following: 10% conceptual plan and preliminary engineering report Topographic and boundary survey Geotechnical engineering Subsurface utility exploration 30% preliminary design, validation of project site constraints and owner's budget Value engineering Lifecycle cost analysis Construction scheduling Easement and/or rights of way acquisition, if required Ceqa compliance Permitting Early equipment procurement 60% plans, specifications, and estimate 90% plans, specifications, and estimate 100% plans, specifications, and estimate Construction Project commissioning Project acceptance and testing Warranty bonds Extended warranty period License Requirements Class "A" Estimated Bid Value $15M - $20M *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Question Deadline 01/30/2026 at 5:00 PM PT Online Q&A :Yes.
Conceptual
Water / Sewer
$20,000,000.00
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 13, 2026
October 13, 2026
Lake Street, Salinas, CA
Related To This Project
Salinas, CA
Bid Date: Feb 26 2026
Salinas, CA
Bid Date: Mar 13 2026
Salinas, CA
Bid Date: Feb 27 2026
Salinas, CA
Bid Date: Mar 20 2026
Salinas, CA
Bid Date: Mar 20 2026
Salinas, CA
Bid Date: Mar 24 2026
Salinas, CA
Bid Date: Jan 27 2026
Salinas, CA
Bid Date: Dec 18 2025
Salinas, CA
Bid Date: Dec 09 2025
Salinas, CA
Bid Date: Oct 30 2025
Salinas, CA
Bid Date: Oct 01 2025
Salinas, CA
Bid Date: Oct 10 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
