BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 2, 2026 at 8:00 PM

Updated May 20, 2026

Site work for a service station / car wash facility in Ames, Iowa. Completed plans call for site work for a service station / car wash facility.

The scope of work involves the installation of two Level 3 Electric Vehicle (DCFC) charging stations and the related buried electrical lines and equipment. All responses must be submitted before the deadline. No late responses will be reviewed. No bidder may withdraw their bid for at least sixty days after the scheduled closing time for receiving bids. The City of Ames reserves the right to reject any or all bids, to waive informalities, and to make such awards as it shall deem to be in the best interest of the City. 2.1 The City is requesting proposals from a qualified company (CONTRACTOR) to install two Level 2 Electric Vehicle (EV) charging stations and related buried electrical lines and equipment at the site listed above. This includes, but not limited to, all work related to supplying power to the EV charger stations as defined in below and the attached drawings. 2.2 CONTRACTOR shall perform the following activities: o Provide and install conduits between power source and EV charging station (2 locations) o Provide and install an in-ground pull box (2 locations - to be approved by City staff during installation) o Provide and install elevated concrete foundation 3" off ground for EV charging station (2 locations) Provide and install circuit breakers o Install two Level 2 EV charging stations o Provide and install wires between power source and EV charging station (2 locations) o Make all wiring connections and terminations (unless noted on the drawings) o Provide and install protective bollards on concrete foundation (where noted on drawings) o Remove paving (as required) o Restore site (paving and ground cover) to original condition 2.3 CONTRACTOR to supply all labor, tools, equipment and materials, unless otherwise noted. 2.4 CONTRACTOR shall activate and test the EV charging stations per manufacturer's recommended procedures. Questions on this requirement should be addressed to Casandra Eames, Engagement Coordinator, City of Ames, 515 Clark Avenue, Ames, Iowa 50010. E-mail: casandra.eames@cityofames.org or phone (515) 239- 5219. Question Deadline 02/26/2026 at 5:00 PM CT Contact Email jill.burt@cityofames.org, Questions on this requirement should be addressed to Casandra Eames, Engagement Coordinator, City of Ames, 515 Clark Avenue, Ames, Iowa 50010. E-mail: casandra.eames@cityofames.org or phone (515) 239- 5219.

Award

Service Station / Car Wash

$17,175.00

Public - City

Site Work

7

10

2

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
130
Active Projects
65
Bidding Soon
1,091
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 5, 2026

March 16, 2026

Project location map

1800 E 13th St, Ames, IA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.