BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 13, 2026 at 8:00 PM

Updated March 14, 2026

Site work and paving for a mixed-use development in Benicia, California. Completed plans call for site work for a playground / park / athletic field; for paving for a playground / park / athletic field; sidewalk / parking lot; and sidewalk / parking lot.

Furnish all labor, materials, tools and equipment necessary to construct accessibility improvements at BENICIA SRA in Solano County, California, complete and in accordance with the plans and specifications therefore and such addenda thereto as may be issued prior to bid opening date. Question Deadline 02/24/2026 at 2:00 PM PT Any discrepancies, omissions, ambiguities, or conflicts in or among the contract documents or doubts as to meaning shall be brought to the State's attention by including your comments directly to Merrilee.Byrnes@parks.ca.gov Answers will be provided by Addendum which will be posted within the Bid Solicitation located on online. License required: A and/or B Engineer's Estimate: $1,200,000 to $1,800,000 Contract Term: 665 Calendar Days from Notice to Proceed The bidder agrees to complete all work within THREE HUNDRED (300) calendar days from the date of written notice to commence work. This time includes ten (10) calendar days allowed for the contractor to begin work. Non-Small Business Preference - refer to "Bidder Declaration," GSPD 05-105 form: A five percent (5%) bid preference is available to a non-small business proposing firms claiming twenty-five percent (25%) California certified small business subcontractor participation. If claiming the non-small business subcontractor preference, follow the directions and fill out the "Bidder Declaration" (GSPD 05-105) which is included in the Bid Forms. Proposers claiming the five percent (5%) preference must commit to subcontract at least twenty-five percent (25%) of the net bid price with one or more California certified small businesses. Participation in Disabled Veteran Business Enterprise Program (DVBE): The minimum DVBE participation percentage goal is 6%. Failure to fulfill the DVBE requirement will render your bid non-responsive. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Playgrounds / Parks / Athletic Fields

$1,800,000.00

Public - State/Provincial

Paving, Site Work

44

22

12

4

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
150
Active Projects
10
Bidding Soon
1,644
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 10, 2026

April 13, 2026

Project location map

1 State Park Road, Benicia, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.