BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 2, 2026 at 7:00 PM

Updated February 3, 2026

Site work and paving for a mixed-use development in Mahomet, Illinois. Conceptual plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The Complexity Factor for this project is 0. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on April 29, 2026, at 10:00 AM at the Region Three/District Five Office in Paris. Phase I/II engineering services are required to provide for the preparation of a project report and final contract plans, specifications, and cost estimates for the 3P Designed Overlay, ADA Improvements, and Bridge Deck Overlays of FAS 1517 (US 150) from Washington St in Mansfield to S Division St in Mahomet in Champaign and Piatt County. The Consultant's Phase I work, if required, may consist of preparing a Project Report. This work may include data collection, Intersection Design Study, cost estimates, traffic management analysis, traffic control plans, crash analysis, quantity computations, stakeholder meetings, ROW plats and plans, abbreviated bridge condition report, and other related work items required to produce a project report. The department will furnish the Consultant with traffic data, existing plans, environmental coordination, utility coordination, survey data, CADD files, inspection reports, and crash data when available. The following structures may be included in this project: S.N. 010-0048: US 150 over Stream S.N. 074-0086: US 150 over N&W RR The Prime firm must be prequalified in the Special Services (Construction Inspection) category to be considered for this project. Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). ILDOT - 043 - RFQ Engineering - US 150 From Washington St in Mansfield to S Division St in Mahomet

Conceptual

Bridges / Tunnels

$6,150,000.00

Public - State/Provincial

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
31
Active Projects
1
Bidding Soon
471
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 19, 2027

Project location map

US-150, Mahomet, IL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.