BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 19, 2026 at 7:00 PM

Updated February 20, 2026

Site work and paving for a mixed-use development in Spooner, Wisconsin. Conceptual plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; water / sewer project; sidewalk / parking lot; and sidewalk / parking lot.

Limit : 1350 FT W OF 1ST ST TO USH 53 To address the deteriorating pavement structure and preserve the function, operation, and safety of this route in the overall transportation system. This rehabilitation project is a pavement replacement project with new 8 concrete over 6 of base course for the urban area and pavement resurfacing (mill 2.25 and pave 3.25) with aggregate shouldering for rural areas, total project length is 2.24 miles. The project will include ADA curb ramp replacements, add new sidewalk and replace existing, USH 63/STH 70 intersection geometric modifications, guardrail replacements, culvert cleaning and replacement, new box culvert and storm sewer design. It is both urban and rural in the City of Spooner on STH 70 from Auto Lane to USH 53, Washburn County. City of Spooner is intending to reconstruct their sanitary sewer/watermain under a separate city project. This will require significant coordination along more intensive public involvement. TLE exhibits are expected for real estate at the pedestrian curb ramp locations. Anticipated Construction Cost: $5,000,000-$5,999,999 The Method of Contractor Selection Has Not Been Determined at This Time. WIDOT - RFP Engineering - Siren - Stone Lake *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Conceptual

Roads / Highways

$5,999,999.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
248
Active Projects
126
Bidding Soon
1,158
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 1, 2026

Project location map

STH 70, Spooner, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.