Published May 21, 2026 at 8:00 PM

Updated May 22, 2026

Site work and new construction of a municipal facility in Spooner, Wisconsin. Completed plans call for the construction of a municipal facility; for site work for a municipal facility; and 18,000-square-foot municipal facility.

As of May 21, 2026, this project has not yet been awarded. The project is expected to be awarded in June 2026. This project is being let using the single prime bidding and contracting process. DFD will publicly bid the applicable mechanical, electrical, plumbing, and fire protection (MEP) divisions of work first. Within 5 days of the MEP bid opening, DFD will identify a lowest, qualified, responsible, certified bidder in each applicable MEP division of work. These successful MEP bids must be included in all general prime contractor bids received. No later than 5 days after DFD identifies the successful MEP bids, DFD will publicly open general prime contractor bids. General prime contractor bids that do not include the successful MEP bids will be rejected. The state will enter into a single contract with the lowest, qualified, responsible, certified general prime contractor and this general prime contractor will enter into subcontracts with the successful MEP bidders. If a project does not include any mechanical, electrical, plumbing, or fire protection divisions of work, DFD will bid one bid package for all work to general prime contractors. In general, the work consists of: Construction of a new multi-divisional facility (approximately 18,000 square feet, one-story, brick cavity wall construction) and parking lot to replace the Division of State Patrol, Spooner Post and Division of Motor Vehicles, Spooner Service Center. . The site contains an existing DOT sign shop which will be demolished to make way for the new building. The site also contains an existing DMV office building which will remain operational until the new building is occupied, and then it also will be demolished. This project will also include a new parking lot and utilities and the construction of a communications radio tower adjacent to the new facility. Base Bid will be received for: A single lump sum bid for All Work. Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted. Bid Result Blakeman Plumbing & Heating, Inc-Plumbing-$348,100.00 Paul's Sheet Metal, Inc-Mechanical-$1,365,724.00 NEO Electrical Solutions, LLC-Electrical-$1,568,750.00 Bid date notes: Hand delivery to the drop box labeled SEALED BIDS ONLY in front of the State of Wisconsin Administration Building located at 101 East Wilson Street, Madison, Wisconsin 53703.

Bid Results

Municipal

$3,282,574.00

Public - State/Provincial

New Construction, Site Work

111

53

22

5

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
261
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 1, 2026

May 1, 2026

Project location map

W7074 Green Valley Rd, Spooner, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.