BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 2, 2026 at 7:00 PM

Updated March 3, 2026

This is a service / maintenance or supply contract in Fairfax, Vermont. Contact the soliciting agency for additional information.

The Town of Fairfax is requesting lawn care bids for the 2026 season (through Nov. 1). Both mowing and trimming/weed whacking is required normally on a weekly basis at the following locations: 1. 12 Buck Hollow Rd. (Town Offices) with weed whacking the ditch (lawn to roadside) required bi-weekly. 2. 1210 Main St (Community Center) 3. Community Corner Park (corner of Main and Maple St.) 4. 15 Goodall St. (Fire Station) 5. 142 Hunt St. (Sewer Plant) 6. Fletcher Rd. Water Treatment Building fenced area (accessed behind 169 Fletcher Rd.) Mowing and trimming of cemeteries is less frequent and is as follows (map available online at Fairfax-vt.gov/bids): 1. Beaver Cemetery - Farm Rd off RT104 mow and trim around stones from side of road to property line in the back (north side) bordered by pine trees, right (east side) bordered by cedar trees, left (west side) bordered by a step bank. Twice per month June through August. Monthly in Sept. and Oct. Total 10 times. 2. Kingsbury/Hibbard - RT104 (2860 Main St) mow and trim around stone as well as mowing 7’ to 8' outside of cemetery on north, east and west sides as far back as possible on south side. Mow a strip from driveway to cemetery along edge of meadow for access. Monthly May through Sept. Total 5 times. 3. Safford Cemetery - Buck Hollow Rd mow and trim from Buck Hollow Rd to backside of cemetery (fence line). Mow to the tree line on the left and right side of cemetery. May to August 15th once a week then every other week. Total 17 times. 4. Spafford Cemetery- Maxfield Rd (off from Goose Pond Rd) mow and trim cemetery as well as 1' beyond border fence of cemetery. Twice per month June through August. Monthly in Sept. and Oct. Total 10 times. 5. Mudgett Cemetery - Off from Fletcher Rd mow and trim all of cemetery and 5' to 6' in front beyond the fence toward the meadow (mow/trim 1' beyond other sides). Twice per month June through August. Monthly in Sept. and Oct. Total 10 times.

Post-Bid

Municipal

$30,000.00

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
581
Active Projects
303
Bidding Soon
2,526
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 15, 2026

April 1, 2026

Project location map

To be determined, Fairfax, VT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.