Site work for a water / sewer project in Peru, Indiana. Completed plans call for site work for a water / sewer project.

The work includes hydro-excavation investigations on approximately 700 utility-side water service lines and approximately 725 customer-side water service lines to identify existing water pipe material, size, and depth. Based on the results, the contractor must coordinate and replace identified lead and galvanized pipe downstream of lead for utility-side only, customer-side only, or full water service line replacements. Approximately 786 replacements are anticipated. Replacement work includes connecting to the existing water main, installation of water service lines, new meter pits, repairing pavement, surface repair, maintenance of traffic, and other incidental work necessary for a complete installation. Work will be conducted in Study Area 4 and performed under a Unit Price Contract. Bids must be properly and completely executed on a State Board of Accounts Form 96 (Revised 2013). Each bid must include the Contractor's Bid Attachment to Form 96, a Financial Statement, and a bid security of not less than 5% of the total bid price. All contractor and subcontractors are required to pay not less than the Federal prevailing wage rates. There is a 7% MBE and 5% WBE participation goal. A conditional or qualified bid will not be accepted. The award will go to the lowest, responsive, responsible bidder, subject to approval by the State Revolving Fund Loan as administered by the Indiana Finance Authority. For contracts over $300,000, the contractor must be qualified under applicable Indiana statutes before doing any work on a Public Works project. Contractors must submit an Employee Drug Testing Plan and complete a Drug Testing Plan Certification with their bid. The owner reserves the right to waive informalities or minor defects, reject any or all bids, or accept the lowest, most responsible and responsive bid, as determined by the owner. No bid may be withdrawn within 90 days after opening. The awarded contractor will be required to furnish acceptable Performance and Payment Bonds in the amount of 100% of the contract price and maintain insurance coverage as described in the contract documents.

Bid Results

Water / Sewer

$4,846,399.00

Public - City

Site Work

5

6

4

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 4, 2026

June 3, 2026

Project location map

Multiple Locations, Peru, IN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.