Site work for a water / sewer project in Mukilteo, Washington. Completed plans call for site work for a water / sewer project.
The work to be performed consists of furnishing all labor, tools, materials, and equipment necessary for the 55th PL W LID Construction Project. The project includes retrofitting the existing stormwater system to provide water quality treatment using Low Impact Development, removal and replacement of existing pavement, sidewalk, curb and gutter, ADA ramp, removal of existing catch basins, and plugging existing pipe. Temporary erosion and sedimentation control measures must be implemented prior to ground disturbance. New installations include Type 1 & Type 2 catch basins, six BioPods, and a new 12-inch stormwater pipeline. All impacted areas, including landscaped areas, are to be restored to pre-disturbed condition. Schedule B work for the Alderwood Water & Wastewater District involves removing an existing 8-inch water main that conflicts with a new stormwater pipe and installing a new 8-inch ductile iron water main below the stormwater pipe, tying it into the existing system. This involves removal and replacement of pavement and restoration of the trench per contract requirements. The estimated project cost is between $750,000 and $800,000, with completion required within 30 working days. Bidders must register at Builders Exchange of Washington to access contract documents. Each bid must be accompanied by a bid bond in at least 5% of the bid amount. Bids must be submitted in writing using the form provided in the bid documents, sealed and received by the specified date and time. The City of Mukilteo reserves the right to reject any or all bids and to waive informalities or minor irregularities. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Bid Results
Water / Sewer
$511,625.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 1, 2026
May 1, 2026
125th St SW & 55th Pl W, Mukilteo, WA
Related To This Project
Mukilteo, WA
Bid Date: Apr 08 2026
Mukilteo, WA
Bid Date: May 13 2026
Mukilteo, WA
Bid Date: May 05 2026
Mukilteo, WA
Bid Date: Mar 18 2026
Mukilteo, WA
--
Mukilteo, WA
Bid Date: Jun 25 2025
Mukilteo, WA
Bid Date: Jul 30 2025
Mukilteo, WA
--
Mukilteo, WA
Bid Date: Apr 10 2025
Mukilteo, WA
Bid Date: Mar 12 2021
Mukilteo, WA
Bid Date: Dec 02 2024
Mukilteo, WA
Bid Date: Nov 07 2024
Mukilteo, WA
Bid Date: Aug 21 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.