Published April 9, 2026 at 8:00 PM

Updated May 20, 2026

Site work for a water / sewer project in Mukilteo, Washington. Completed plans call for site work for a water / sewer project.

The work to be performed consists of furnishing all labor, tools, materials, and equipment necessary for the 55th PL W LID Construction Project. The project includes retrofitting the existing stormwater system to provide water quality treatment using Low Impact Development, removal and replacement of existing pavement, sidewalk, curb and gutter, ADA ramp, removal of existing catch basins, and plugging existing pipe. Temporary erosion and sedimentation control measures must be implemented prior to ground disturbance. New installations include Type 1 & Type 2 catch basins, six BioPods, and a new 12-inch stormwater pipeline. All impacted areas, including landscaped areas, are to be restored to pre-disturbed condition. Schedule B work for the Alderwood Water & Wastewater District involves removing an existing 8-inch water main that conflicts with a new stormwater pipe and installing a new 8-inch ductile iron water main below the stormwater pipe, tying it into the existing system. This involves removal and replacement of pavement and restoration of the trench per contract requirements. The estimated project cost is between $750,000 and $800,000, with completion required within 30 working days. Bidders must register at Builders Exchange of Washington to access contract documents. Each bid must be accompanied by a bid bond in at least 5% of the bid amount. Bids must be submitted in writing using the form provided in the bid documents, sealed and received by the specified date and time. The City of Mukilteo reserves the right to reject any or all bids and to waive informalities or minor irregularities. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Water / Sewer

$511,625.00

Public - City

Site Work

59

13

2

3

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
260
Active Projects
116
Bidding Soon
2,052
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 1, 2026

May 1, 2026

Project location map

125th St SW & 55th Pl W, Mukilteo, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.