BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 26, 2025 at 8:00 PM

Updated June 27, 2025

Site work for a civil project in Mukilteo, Washington. Completed plans call for site work for a bridge / tunnel; and water / sewer project.

Repairing the left wingwall with additional steel piling, fender systems and structural steel and other work. Involves 50 working days and 20 bid items. Work class 6 - bridges and structures. County : Snohomish County Estimated value : $900,000 - $1,000,000 A state funded project with a 5% public works small business enterprise goal and a 2% veteran owned business goal. WADOT - SR 525, Mukilteo Ferry Terminal Left Wingwall Repair *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Bridges / Tunnels

$1,495,505.00

Public - State/Provincial

Site Work

20

15

4

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
189
Active Projects
97
Bidding Soon
1,426
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 25, 2025

January 5, 2026

Project location map

WA-525, Mukilteo, WA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.