BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 14, 2025 at 8:00 PM

Updated April 15, 2025

Renovation of a water / sewer project in Mukilteo, Washington. Completed plans call for the renovation of a water / sewer project.

The work includes new electrical pathways and feeder circuits with conduit and wiring, replacement of the existing generator, automatic transfer switch, and motor control centers. The Contractor shall provide allcivil, structural, mechanical, electrical, controls, and incidental work for a complete and operable installation in accordance with the Contract Provisions and Contract Plans. Mandatory 15% apprentice labor hours of the total labor hours are a requirement of the construction contract. Bidders may contact the Department of Labor & Industries (L&I), Apprenticeship Section, to obtain information on available apprenticeship programs. The estimated construction cost is $3,785,000. If there is any doubt or uncertainty as to themeaning of same, intending Bidders or Contractors should request clarification from the Engineer before submitting theirproposal. The Proposals will be publicly opened and read aloud shortly after the time and date stated above. Proposals are tobe submitted only on the form provided with the Contract Provisions. All Proposals must be accompanied by a certified check,cashiers check, money order, or bid bond payable to the Mukilteo Water and Wastewater District and in an amount of not lessthan five percent (5%) of the total amount bid. The three lowest bids may not be withdrawn for 60 days after the day of bidopening. All bidders are required to attend a Mandatory Prebid Conference. Financing of the Project has been provided by Mukilteo Water and Wastewater District, Washington. TheMukilteo Water and Wastewater District expressly reserves the right to reject any or all Proposals and to waive minorirregularities or informalities and to Award the Project to the lowest responsive, responsible Bidder as it best serves theinterests of the District. If you have questions, please contact the following two individuals:1. Andrea Swisstack, Engineering Manager (MWWD) aswisstack@mukilteowwd.org 2. Cameron Ochiltree, P.E., ProjectManager (BHC) cameron.ochiltree@bhcconsultants.com Bidders and/or Contractors are notified to examine thoroughly the bidinstructions, proposals, the form of Contract, Drawings and Specifications.

Bid Results

Water / Sewer

$3,351,180.00

Public - City

Renovation

51

20

22

4

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
195
Active Projects
80
Bidding Soon
1,849
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 10, 2025

May 26, 2025

Project location map

9417 62nd Pl W, Mukilteo, WA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.