BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 17, 2026 at 8:00 PM

Updated March 27, 2026

Renovation of a mixed-use development in Franklin, Indiana. Completed plans call for the renovation of a 13,300-square-foot swimming pool.

Franklin Community Schools is seeking proposals from qualified contractors for the complete renovation and relamination of the competition swimming pool at Franklin Community High School. The project includes the supply and installation of a reinforced PVC membrane system, replacement of tile components, and installation of new gutter grating and safety flooring. Work involves removal and disposal of existing materials, surface preparation, installation of a new membrane system, new tile installation (perimeter, waterline, and finger grip), installation of applied markings (replacing old tile targets with PVC), and installation of new gutter grating. The scope also includes supplying and installing PEM Soft Walk flooring (or approved equivalent matting) for the entry area. The pool specifications include a length of 175 ft, width of 76 ft, water surface area of 13,300 sq.ft., perimeter of 521 ft, and volume of 454,000 gallons. Bids will only be accepted from contractors with demonstrated experience in installing reinforced PVC commercial pool membranes, required certification, and proper insurance. Proposals should include a company profile, project approach, cost breakdown, timeline, warranty details, and references for at least three similar commercial pool projects completed in the last five years. Proposals will be evaluated based on compliance with technical specifications, total project cost, experience and references, proposed timeline and availability, and warranty terms. The selected contractor will be responsible for the complete relamination of the competition pool floor, walls, and gutter systems. This includes all surface preparation, material supply, installation, and waste disposal. Key components of the scope include: Removal and disposal of existing applicable materials. Surface preparation of the pool shell to ensure proper adhesion and finish. Installation of a new reinforced membrane system. New tile installation (perimeter, waterline, and finger grip). Installation of applied markings (replacing old tile targets with PVC). Installation of new gutter grating. Start date is August 3, 2026 and work needs to be completed in 6-8 weeks.

Post-Bid

Swimming Pools

$500,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
34
Active Projects
0
Bidding Soon
685
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 26, 2026

August 3, 2026

Project location map

998 Grizzly Cub Dr, Franklin, IN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.