BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 9, 2026 at 8:00 PM

Updated May 20, 2026

Site work, paving and new construction of a multi-residential development in Centralia, Illinois. Completed plans call for the construction of a 2,400-square-foot multi-residential development.

For questions regarding the Scope of Work, please contact Kaden Mollet at modernization@mchahomes.org Base Scope of Work o MCHA is soliciting Sealed Bids to construct a new 30'x 80' Building with Parking Lots. o Rough plans and supporting notes are included at the conclusion of this document. o A 11 x 17 Drawing can be picked up at the MCHA Office, 719 E Howard, Centralia IL o The Making of the final blueprints, plans, and specs shall be included in your Bid. o All work to be completed by July 30 th , 2026 Contractor will be responsible for the following: 1. Meeting City of Centralia requirements for New Construction. 2. All Building Permits before construction begins. 3. Adhere to all local Building Codes. 4. Zoning Compliance. 5. Schedule and Coordinate Inspections. 6. Proper waste control. 7. All Phases of construction. 8. Prevailing wages. 9. Weekly Time Sheets, Certified Payroll. 10. Supervising all Sub-contractors. 11. Weekly Time Sheets, Certified Payroll of the Sub-contractors. 12. Security of the construction site and of all materials and Tools. o Contractor must obtain approval from the Procurement Specialist before submitting any invoice. If unforeseen conditions arise during construction that require additional work to achieve satisfactory completion, the contractor must notify MCHA immediately. o The contractor is fully responsible for repairing any damages to buildings, driveways, fences, landscaping, or other property caused by their personnel or subcontractors. All repairs must meet the satisfaction of MCHA. If not, liquidated damages equal to the cost of restoration will be deducted from the contract amount. The attached drawing is not final. All elements are subject to change, and door and window locations are intentionally omitted. Bidders must develop the final plans and submit pricing based on how they would complete the project. Concrete Work o New shop floor (all concrete) shall be constructed approximately 6 inches higher than the existing shop floor elevation. o Concrete shall be placed as designated on the drawing, with expansion joints at 15'-0" each way. o Edge rods shall be installed at 24 inches on center at all corners. o All expansion joints shall be caulked using a high-quality concrete sealant, Donseal PU440 (gray) or approved equivalent. Footings & Foundation Walls o Footings: 20 inches wide. o Foundation walls: 10 inches wide. o Reinforcement: o #4 vertical bars at 4'-0" on center o #4 horizontal bars continuous at 8 inches on center o Foundation walls shall extend 6 inches above the new shops finished floor. Wall Construction o Wall heights: o 10 feet for the shop o 8 feet for the breezeway o Framing: 2" x 6" studs at 24" on center, with a pressure-treated bottom plate and double top plate. o Exterior walls: Covered with 1/2 -inch sheathing. Roof & Trusses o Trusses spaced 2 feet on center. o 2" x 4" purlins spaced 2 feet on center. o Roof and walls to be clad in 26-gauge ribbed white metal panels. o A 1/2 -inch layer of solid foam insulation shall be installed beneath the roof panels. Openings (Final Locations Determined by Bidder) o (3) 12' overhead doors o (5) 24" x 48" windows o (3) 36" walk-in doors Specified Installations o Install three (3) 12' x 8' insulated overhead garage doors on the north side of the new shop. o Install five (5) 24" x 48" fixed insulated windows on the south side of the new shop. o Install a 36" left-hand reverse door between the breezeway and the new shop. o Install a 36" left-hand door on the north side of the breezeway to the exterior. o Install a 36" left-hand door at the northwest corner of the new shop (door to face north). o Install a drain line running from the north side of the breezeway to the road. Door, Window, and Overhead Door Specifications Walk-In Doors o Exterior steel-clad o Composite framing and brick mold o Factory-painted white, both sides o Double-bore Overhead Doors o 12 ft wide x 8 ft high o Insulated o White, raised-panel design o No windows o Torsion spring type Windows o 24" x 48" o White vinyl o Single fixed insulated glass

Bid Results

Multi-Residential

$164,698.00

Public - County

New Construction, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
255
Active Projects
118
Bidding Soon
1,490
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 27, 2026

April 27, 2026

Project location map

700 E Rexford St, Centralia, IL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.