BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 15, 2026 at 8:00 PM

Updated May 20, 2026

Site work and paving for a civil project in Rhinelander, Wisconsin. Completed plans call for site work for a bridge / tunnel; road / highway; and for paving for a road / highway.

**As of April 13, 2026 , this project has not yet been awarded. The project is expected to be awarded on April 21, 2026.** Town of Crescent is accepting sealed bids for the following road projects: Beyer Road 60 miles of single chip sealing with fog and crack sealing (flex or mastic) North Rifle Road-2.08 miles of single chip sealing with fog and crack sealing (flex or mastic) and striping for railroad Range Line Road-1.8 miles single chip sealing with fog and crack sealing (flex or mastic) Sterling Road-26 HIMAC Patching and Crack Sealing 2. Culvert Replacements on Fire Tower Rd Hat Rapids Road-02 miles reconstruction Long Lake Road-500 HMAC resurfacing & shouldering, and 1.78 miles of single chip sealing with fog and crack sealing (flex or mastic) BEYER ROAD sealing: .60 miles (3,168 feet) from County Highway N to Termini. Beyer Road is 20' wide. The work for patching under this contract consists of preparing the surface and applying a rubberized "Flex" patch to cracks in the road surface prior to the chip seal work. The work for single chip sealing under this contract consists of sweeping any loose material off the existing surface, application of a bituminous emulsion and surface chips, sweeping after the application, and application of a fog seal to the new chip seal surface. ALTERNATE A - Use Asphalt Repair Mastic in place of flex patching. ASPHALT REPAIR MASTIC A. This work consists of cleaning, filling, and leveling the cupped cracks and other depressions to seal out water and improve ride quality with asphalt repair mastic material. B. Furnish applied, pre-packaged, pourable, aggregate filled, polymer modified asphalt repair mast Pointe Pave Patch Black, Maxwell Gap Mastic 201, P&T Products Dura-Fill Mastic T2, Pure Asphalt Mastic SR, or a town approved equal. C. Heat the asphalt repair mastic in a thermostatically controlled, hot oil jacketed mastic mixer equipped with a full sweep horizontal agitator that can maintain a uniformly mixed product. The mixer must have an effective means of dispensing the thoroughly mixed mastic material. D. Prepare all surfaces by ensuring they are free from dust, dirt, oil, grease and loose material prior to application of the mastic using clean, dry, oil free compressed air at 90 psi minimum. Sound substrate surfaces and remove delaminated material prior to final cleaning. Ensure the surfaces of the pavement are completely dry and clean at the time of mastic application. The Town of Crescent reserves the right to reject any or all proposals and will accept the proposal most advantageous to the Town. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com. All work on this project shall be completed before September 18, 2026. Bid Result Beyer Road - Pitlik and Wick - 24,709 Fire Tower Culverts - Oettinger - 59,450 Hat Rapids - American Asphalt - 9,511 Long Lake Rd - Fahrner - 88,978 N. Rifle Rd - Fahrner - 77,550 Range Line Rd - Fahrner - 62,890 Sterling Rd - Pitlik and Wick - 8,200

Bid Results

Roads / Highways

$331,288.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
96
Active Projects
68
Bidding Soon
532
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 7, 2026

May 7, 2026

Project location map

Multiple Locations, Rhinelander, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.