BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 4, 2026 at 7:00 PM

Updated February 5, 2026

Renovation of a fire / police facility in Rhinelander, Wisconsin. Completed plans call for the renovation of a one-story above grade fire / police facility.

The Oneida County Buildings & Grounds Department is accepting bids for the replacement of the cooling tower at the Law Enforcement Center and the installation of a new chilled water cooling coil in the air handling unit (AHU). Sealed bids must be submitted to the Oneida County Clerk at the Oneida County Courthouse, PO Box 400, Rhinelander, WI 54501. The County reserves the right to reject any or all bids and to accept the bid deemed most advantageous to the County. Question Deadline 01/23/2026 Every request for such interpretation should be in writing addressed to Lindsey Kennedy at PO Box 400, Rhinelander, WI 54501 or lkennedy@oneidacountywi.gov and to be given consideration must be received at least SEVEN DAYS prior to the date fixed for the opening of Bids. General Description The contractor shall provide all labor, materials, equipment, and services necessary to complete a combined mechanical upgrade project involving the replacement of the buildings cooling tower and the installation of a new chilled water cooling coil in AHU5. All work shall comply with applicable codes, industry standards, and manufacturer recommendations. Scope of Work 1. Removal and Demolition Remove and properly dispose of the existing cooling tower. Remove and dispose of unused or abandoned condenser water piping on the roof. Prepare rooftop and mechanical areas for installation of new equipment. Maintain a clean and safe work site throughout the project and protect all existing property. Coordinate all work and any required system shutdowns with County staff at least 72 hours in advance. 2. Cooling Tower Replacement Provide and install a new cooling tower of appropriate capacity to serve the existing system. Include all required components for proper operation, such as water level controls, basin/sump heating as needed, fan and motor equipment, and any protective or operational accessories. Install and connect all associated piping, valves, supports, and accessories necessary for a complete, functional system.

Award

Fire / Police

$234,725.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
13
Active Projects
0
Bidding Soon
142
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 30, 2026

March 2, 2026

Project location map

2000 E Winnebago St, Rhinelander, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.