BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 8, 2026 at 8:00 PM

Updated May 16, 2026

Site work for a water / sewer project in Kent, Washington. Completed plans call for site work for a water / sewer project.

The project consists of approximately 16,840 LF of cured-in-place pipe (CIPP) lining of existing storm sewer, culvert pipes and sanitary sewer pipes of various diameters, reinstatement of lateral connections, sewer manhole installation to replace existing cleanouts, sewer manhole rehabilitation, and other work all in accordance with the Contract Provisions and WSDOT Standard Specifications. The cured-in-place pipes shall be installed with the inversion method and water or steam curing. *Bid Date Desc: All bids must be properly marked and sealed in accordance with this "Invitation to Bid." Bids must be delivered and received at the City Clerk's office by the stated time, regardless of delivery method, including U.S. Mail. All bids will be opened and read publicly aloud immediately The City Clerk will read the bids out loud from the Clerk's office. Individuals can stand in the lobby outside the Clerk's office during the bid opening to hear the bid results. The Engineer's estimated range for this project is approximately $2,900,000 to $3,200,000. A cashier's check, cash or surety bond in the amount of 5% of the bid must be included with the bid. The City of Kent reserves the right to reject any and all bids on any or all schedules or alternates or to waive any informalities in the bidding and shall determine which bid or bidders is the most responsive, satisfactory and responsible bidder and shall be the sole judge thereof. Note: The award of the contract will not occur until the City of Kent has reviewed all bids for responsiveness and responsibility determinations and the Kent City Council has formally awarded the contract. For technical questions, please call Joseph Araucto at 253-856-5664. No bidder may withdraw his/her bid for a period of sixty (60) days after the day of bid opening. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Water / Sewer

$3,088,909.00

Public - City

Site Work

20

10

3

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
219
Active Projects
97
Bidding Soon
1,210
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 21, 2026

June 22, 2026

Project location map

7925 S 196th St, Kent, WA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.