BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 7, 2026 at 8:00 PM

Updated May 16, 2026

Site work for a water / sewer project in Boulder, Colorado. Completed plans call for site work for a water / sewer project.

Reference Number 0000420548 Open Bids: Mid June, 2026 • Award Contract: Early July, 2026 The City of Boulder (City or Owner) is soliciting Statements of Qualifications (SOQ) for General Contractor Prequalification from contractors interested in submitting a bid for construction of the Goose Creek Interceptor Pipeline Replacement - Phase 2 (GCI-PH2 or Project). The project Work is located within the limits of the City of Boulder generally along Pearl Street from 47th St. east to 50th St. The Work encompasses replacement of approximately BASE BID: The Work included in the Base Bid consists of the following project components: Construction of approximately 2,615 linear feet of new 30-inch diameter polyvinyl chloride (PVC) gravity sanitary sewer pipe Installation of eight (8) new 5-foot diameter circular precast manhole structures with an interior corrosion protection lining system BID ADD ALTERNATE A: The Work in Bid Alternative A includes installation of approximately 2,615 linear feet of new FRPM sanitary sewer pipe, in lieu of PVC pipe and installation of eight (8) 5-foot diameter circular polymer concrete manhole structures, in lieu of precast manhole structures with interior corrosion protection lining system. Question Deadline 05/01/2026 at 5:00 PM MT Questions are submitted online No Specific questions regarding the Project or the qualification process shall be addressed, in writing to Chris Olson, PE, CWP, Olsonc@BoulderColorado.gov The current Engineers Opinion of Probable Construction cost (EOPCC) for the Project is estimated to be in the range of $4,500,000 to $5,500,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The City reserves the right to reject any or all SOQs, to waive irregularities therein in determining the firms qualifications, and to prequalify contractors that it deems are in the best interest of the City.

Post-Bid

Water / Sewer

$5,500,000.00

Public - City

Site Work

32

6

5

Subscribe For Documents

122 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
241
Active Projects
110
Bidding Soon
1,174
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 7, 2026

July 15, 2026

Project location map

Multiple Locations, Boulder, CO


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.