Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 12, 2026 at 8:00 PM
Updated May 16, 2026
Site work, new construction and renovation of an educational facility in Helena, Montana. Completed plans call for the renovation of a 36,415-square-foot educational facility; and for the construction of a 241,719-square-foot educational facility.
Dick Anderson Construction (GC\CM) seeks to qualify and select an Electrical Subcontractor to undertake Preconstruction and Construction services for the Electrical Systems scope of work on the Helena High School Project. The overall Electrical Scope will be split into (2) Individual Scopes: 1. Electrical Special Systems. 2. Electrical Systems. This is a Montana Prevailing Wage Rate project. The selected Subcontractor will be expected to provide: 1. FOR THE PRECONSTRUCTION PHASE: Input to the construction team on materials & methods of construction, constructability, scheduling and cost estimating culminating in a Guaranteed Maximum Price for their portion of the work at a time to be determined. Also provide input for Bid Packs to allow material suppliers an equal opportunity for bidding the material portions of the Work. 2. FOR THE CONSTRUCTION PHASE: Provide all necessary materials, tools, labor and equipment for construction portions of the Project. Subcontractor must be able to provide Payment and Performance bonds for their portion of the work. This Project is being delivered on a Fast Track schedule. Time is of the essence, as the project shall be fully complete and ready for occupancy at the start of the 2028 school year. Helena School District has selected A&E/SMA as the Design Firm for the project. The project consists of: NEW SCHOOL TOTALING 241,719 SF RENOVATIONS TO EXISTING SCHOOL TOTALING 36,415 SF Subcontractors seeking a position on the team must submit documentation in the form required by the RFQ/RFP. The RFQ/RFP can be obtained by contacting: Estimate = total project construction cost estimate.
Post-Bid
Educational
$90,000,000.00
Public - City
New Construction, Renovation, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 5, 2026
July 6, 2026
1300 Billings Ave, Helena, MT
Related To This Project
Helena, MT
Bid Date: May 12 2026
Helena, MT
Bid Date: May 19 2026
Helena, MT
Bid Date: May 18 2026
Helena, MT
Bid Date: May 18 2026
Helena, MT
Bid Date: May 18 2026
Helena, MT
Bid Date: May 07 2026
Helena, MT
Bid Date: May 26 2026
Helena, MT
Bid Date: May 21 2026
Helena, MT
Bid Date: May 27 2026
Helena, MT
Bid Date: May 26 2026
Helena, MT
Bid Date: May 26 2026
Helena, MT
Bid Date: May 21 2026
Helena, MT
Bid Date: May 26 2026
Helena, MT
Bid Date: May 28 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
