Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 19, 2026 at 8:00 PM
Updated May 29, 2026
Site work for a communication facility in Tyler, Alabama. Completed plans call for site work for a communication facility.
Project Summary: The City has launched the Power Factor Correction Project (PFCP) which aims to increase the efficiency of energy consumption. To support this project, The City is looking to hire a contractor to purchase and install power factor correction equipment at various City owned sites. The contractor must satisfy the requirements of Appendix H1 - Prime Contractor for Safety Requirements. This RFQ is open to all proponents. No prequalification is required. This procurement process is not intended to create, and will not create a formal, legally binding bidding process. It will instead be governed by the law applicable to direct commercial negotiations. Scheduled Operational Date: 2027-11-30 Questions must be submitted by email no later than - Jun 2, 2026 at 2:01 pm (MT) All questions must be submitted in SAP Ariba through the solicitation message board.
Sub-Bidding
Communication
$400,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 9, 2026
October 30, 2026
Multiple Locations, Tyler, AL
Related To This Project
Tyler, AL
--
Tyler, AL
Bid Date: Mar 20 2026
Tyler, AL
--
Tyler, AL
Bid Date: Nov 17 2025
Tyler, AL
Bid Date: Oct 30 2025
Tyler, AL
Bid Date: Aug 27 2025
Tyler, AL
Bid Date: Jul 08 2025
Tyler, AL
Bid Date: Nov 04 2024
Tyler, AL
Bid Date: Nov 04 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
