BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 22, 2026 at 8:00 PM

Updated July 8, 2026

Site work for a water / sewer project in Burley, Idaho. Design plans call for site work for a water / sewer project.

Project work includes gravity system upgrades, a new wet well, force main infrastructure, large-diameter conveyance piping, and lift station facilities. The upgrades will increase treatment capacity, improve system performance, and infrastructure improvements. As of June 22, 2026, this project is in the design phase. An engineer has been selected for the project. Information regarding the general contractor selection timeline has not been disclosed. Per the owner, a firm construction timeline has not been released.

Design

$130,000,000.00

Public - City

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
17
Active Projects
2
Bidding Soon
131
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Project location map

To Be Determined, Burley, ID

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.