Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 5, 2026 at 8:00 PM

Updated October 11, 2026

Site work for a municipal facility in Rigby, Idaho. Completed plans call for site work for a municipal facility.

Question Deadline 07/29/2026 at 2:00 PM PT Questions regarding the Request for Proposal and Bid must be submitted in writing and received by Big-D Construction. Questions received after this day and time will not be considered. Submit questions via email to tim.bybee@big-d.com Also included, but not specifically limited to: 1. Provide all reinforcing steel , drilling, doweling, concrete dobies, tie wire, etc. associated with this Scope of Work. 2. Provide all concrete, including, but not limited to; concrete footings and concrete slab on grade. 3. Provide grouting of structural steel columns bases. 4. Set bollards (supplied by others) and fill with concrete. 5. Provide installation of all anchor bolts and embeds (supplied by others). 6. Provide concrete material. 7. Provide concrete pumping. 8. Provide all concrete saw cutting, control and expansion joint systems. 9. Provide joint sealants. 10. Provide concrete sealer/sealants. 11. Provide vapor barrier at building slab-on-grade locations. 12. Provide concrete washout and disposal. 13. Provide layout - (Control points and building grids will be provided). Award is subject to final approval.

Award

$69,538.00

Public - State/Provincial

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
34
Active Projects
16
Bidding Soon
255
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 6, 2026

September 7, 2026

Project location map

206 N Yellowstone Hwy, Rigby, ID

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed