Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published July 30, 2026 at 8:00 PM
Updated August 5, 2026
Site work, paving and renovation of a playground / park / athletic field in Pompton Lakes, New Jersey. Completed plans call for the renovation of a playground / park / athletic field.
Replacement of approximately 1,425 linear feet of walking trail including removal of existing porous concrete and subsoil and installation of a porous asphalt walking trail consisting of crushed stone base course, non-woven geotextile fabric, intermediate course, and porous asphalt surface course, plus lawn restoration and bollard installation. Bonds: $20,000 Bid Bond, Certified Check required, 100% Performance Bond, 100% Payment Bond. Cost estimate range at $100,000.00 - $150,000.00 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. This project is for the replacement of approximately 1,425 linear feet of walking trail at Hershfield Park split between the Base Project ( 1,170 LF) and the Add Alternate (250 LF). The trail varies in width from 14 feet to 16 feet. The existing porous concrete walking and trail and subsoil is to be removed and replaced with a porous asphalt walking trail consisting of: a four (4) inch thick base course of 1-1/2" crushed stone; a layer of non-woven geotextile fabric; a two (2) inch thick intermediate course of 3/4" crushed stone and concrete sand mix; and a three (3) inch layer surface course of porous asphalt. The main items of construction and approximate quantities in the BASE BID include, but are not necessarily limited to : 1,800 SY of porous concrete walking trail (6” average thickness) removal; 320 tons of subsoil removal; 420 tons of 1-1/2" crushed stone; 240 tons of 3/4" crushed stone and concrete sand mix, 1,800 SY of geotextile fabric; 370 tons of porous asphalt pavement; 1,100 SY of lawn restoration; and, four (4) collapsible bollards.
GC Bidding
$150,000.00
Public - County
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 19, 2026
September 18, 2026
Hershfield Park Pl, Pompton Lakes, NJ
Related To This Project
Pompton Lakes, NJ
Bid Date: Aug 19 2026
Pompton Lakes, NJ
Bid Date: Apr 23 2026
Pompton Lakes, NJ
Bid Date: Jul 01 2026
Pompton Lakes, NJ
Bid Date: Nov 25 2025
Pompton Lakes, NJ
Bid Date: Nov 25 2025
Pompton Lakes, NJ
Bid Date: Oct 22 2025
Pompton Lakes, NJ
Bid Date: Sep 04 2025
Pompton Lakes, NJ
Bid Date: Aug 21 2025
Pompton Lakes, NJ
Bid Date: May 29 2025
Pompton Lakes, NJ
Bid Date: Aug 06 2025
Pompton Lakes, NJ
Bid Date: Apr 29 2025
Pompton Lakes, NJ
Bid Date: Apr 22 2025
Pompton Lakes, NJ
Bid Date: May 22 2025
Pompton Lakes, NJ
Bid Date: Apr 22 2025
Pompton Lakes, NJ
Bid Date: Jun 04 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
