Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 9, 2026 at 8:00 PM

Updated October 15, 2026

Demolition, site work, new construction and renovation of a water / sewer project in Florence, Colorado. Completed plans call for the demolition of a water / sewer project; for the renovation of a water / sewer project; and for the construction of a water / sewer project.

Construction of vault modifications, master meter replacement, and bypass installation for a water utility system. Work includes excavation, trench protection, dewatering, demolition, pipe and valve installation, concrete work, and disinfection. Question Deadline 10/13/2026 The project includes, but is not necessarily limited to, the following: Removal and disposal of existing vault piping, valves, master meter, backflow-related components, existing sump pump, and other components identified for removal on the drawings. Construction of the proposed temporary/permanent bypass arrangement, including two 6- inch bypass tees with isolating valves, approximately 44 linear feet of 6-inch AWWA C900 DR 18 restrained PVC bypass piping, associated 6-inch restrained-joint ductile iron fittings, bends, sleeves, restraints, thrust wall , and appurtenances shown on the drawings. Modifications within the existing 12-foot by 6-foot backflow preventer vault and existing master meter vault, including installation of the proposed double-check backflow prevention assembly and isolation valves and associated vault piping modifications. Installation of the new City-furnished master meter in the existing master meter vault. The City will furnish the new master meter; the Contractor shall furnish all labor, fittings, appurtenances, installation, testing, and related work necessary for a complete installation. Installation of buried valves, valve boxes, restrained joints, Megalugs or approved equals, polywrap, tracer wire/marking tape, and other materials in accordance with the drawings. Construction of the concrete thrust wall and required reinforcing, structural backfill, and related work. Thrust wall concrete shall achieve the strength required by the drawings before the new line is placed under axial thrust. Field verification and potholing of existing connection points, utilities, pipe sizes, elevations, and conditions before construction and notification of the City and Engineer of discrepancies. Hydrostatic testing , flushing, disinfection, and final connection to the existing water system in accordance with the drawings, AWWA requirements, and the approved tie-in plan . Protection and restoration of all disturbed areas, including fencing, vegetation, access areas, pavement or other surfaces affected by the work. Coordination with the City of Florence and East Florence Water District for shutdown timing and system isolation. Only City of Florence staff shall operate valves on the existing water system. Project Location - East Florence Water Association master meter/backflow vault area, Florence, Colorado; see drawings for exact project limits and access.

GC Bidding

$500,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
54
Active Projects
28
Bidding Soon
465
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 15, 2026

October 19, 2026

Project location map

CO-115, Florence, CO

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed