BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 19, 2021 at 8:00 PM

Updated August 15, 2025

Site work and paving for a civil project in Cheyenne, Wyoming. Completed plans call for site work for a road / highway; for paving for a road / highway; bridge / tunnel; and bridge / tunnel.

Milling plant mix, bituminous pavement surfacing, chip seal, bridge rehabilitation and miscellaneous work on approximately 9.60 miles on US 85 beginning at RM 47.00 between Cheyenne and Torrington. County: Laramie It is the responsibility of the Contractor to ensure that the bid envelope is received by Contracts and Estimates personnel, which can beverified by calling 307-777-4487. The Department of Transportation places the responsibility for timely delivery of bids with the bidder. Bidders may elect to have their bids delivered by any delivery service, or may hand carry their bids to the above street address. Any bids received at the letting after 11:00 AM on the above date will be returned to the bidders unopened. For questions regarding ICX bidding software, please contact Mark Janicek in the Contracts & Estimates office. Office number (307) 777-4214, Mobile: (307) 630-4727 (Available the day prior to and day of letting). Note: Mark will be on location the night prior to and the day of the letting. In the event Mark is unavailable, please call: Contracts & Estimates. Office number: (307) 777-4487. WYDOT Resident Engineer: Wayne Shenefelt, P.E., Cheyenne (307)777-4405 Contractors desiring to look over the project before bidding are requested to make an appointment with the Engineer 24 hours in advance. It is mandatory that all bids be prepared electronically using WYDOT Electronic Bid System (EBS) and a hard copy of the bid be Submitted. An electronic bid bond is preferred, in the amount of 10 percent of the total bid. In lieu of the electronic bid bond, a cashier's check payable to the Transportation Commission of Wyoming in the amount of 10 percent of the bid is acceptable. The Wyoming Department of Transportation reserves the right to reject any and all bids. Bids will be considered by the Transportation Commission of Wyoming, April 15, 2021. WYDOT - Call Order 4 Cheyenne - Torrington (Gun Barrel North and Meriden Sections)

Award

Roads / Highways

$4,427,882.00

Public - State/Provincial

Paving, Site Work

125

1

2

8

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
77
Active Projects
38
Bidding Soon
474
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 8, 2021

June 8, 2021

Project location map

US-85, Cheyenne, WY


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.