EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 16, 2022 at 8:00 PM

Updated October 1, 2024

Renovation of an educational facility in Pen Argyl, Pennsylvania. Completed plans call for the renovation of a educational facility.

As of 1/13/2022, per the owner no bids were received. A timeline to rebid the project has not yet been established. Questions will be accepted until 4:00 P.M., prevailing time, on February 18th, 2022; questions will be accepted through PennBid, only from prime bidders. All questions must be submitted through PennBid and will not be accepted in any other manner. All bids must be accompanied by a bid security made payable to Pen Argyl Area School District in the amount of ten percent (10%) of the base bid and in the form of a certified or bank check or a Bid Bond issued by a surety. Performance Bond and a Labor Material and Payment Bond equal to 100% of the contract price will be required from the lowest responsible bidders. Surety shall be satisfactory to the School District and shall be included in the contractor's bid amount. Pen Argyl Area School District reserves the right to accept or reject any or all Bids and to make or not make awards in the best interest of the Pen Argyl Area School District.

Bid Results

Educational

$426,524.00

Public - City

Renovation

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Special Procedures, Alteration Project Procedures, Execution and Closeout Requirements, Closeout Submittals, Bonds
Division 05 - Metals

Division 05 - Metals

Metal Fabrications
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Scaffolding
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Excavation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Cranes

Find More Local Projects

Within 75 Miles of This Project
463
Active Projects
237
Bidding Soon
4,351
All Active Projects
1,951
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 28, 2022

March 30, 2022

img_map_placeholder

501 W Laurel Ave, Pen Argyl, PA


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Pen Argyl High School - Copula Restoration

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.