EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 31, 2023 at 8:00 PM

Updated October 1, 2024

Site work for a playground / park / athletic field in Freemansburg, Pennsylvania. Completed plans call for site work for a playground / park / athletic field.

The project consists of constructing the Park Amphitheater, including furnishing all supervision, technical personnel, labor, materials, machinery and equipment, tools, appurtenances, and all other associated work listed herein and as indicated on the plans. Clarification Deadline: 8/16/2023 3:00 PM Notice to Proceed is anticipated to be approximately mid to late October. As stated in the Agreement of the Specs, the calendar day duration is 180 days. Each bid must be accompanied by a certified check drawn to the order of Freemansburg Borough; or a Bid Bond in favor of Freemansburg Borough at 5% of the total bid price. Said check or bond shall be subject to the conditions in the Instructions to Bidders. Bidders are advised that Federal Davis-Bacon wage rates, promulgated by the U.S. Government (through SAM.gov), must be paid to workmen employed on this project. No bid may be withdrawn within sixty (60) days of the bid opening date. Freemansburg Borough reserves the right to reject any and all bids and to waive any bidding informalities. The project consists of constructing the Park Amphitheater, including furnishing all supervision, technical personnel, labor, materials, machinery and equipment, tools, appurtenances, and all other associated work listed herein and as indicated on the plans. All documents and details are available electronically at PennBid - https://pennbid.procureware.com.

Bid Results

Playgrounds / Parks / Athletic Fields

$652,500.00

Public - City

Site Work

12

31

14

5

Subscribe For Documents

60 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Reinforcing Steel
Division 04 - Masonry

Division 04 - Masonry

Masonry, Common Work Results for Masonry, Masonry Reinforcing Bars, Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Joists, Steel Joist Framing, Metal Decking, Steel Decking, Metal Fabrications, Metal Railings
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Thermal Insulation
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Windows, Aluminum Windows, Plastic Windows, Hardware, Door Hardware
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Portland Cement Plastering, Gypsum Board, Painting and Coating
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, Meters and Gages for Plumbing Piping, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Meters and Gages for HVAC Piping, General-Duty Valves for HVAC Piping
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Fill, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Batching Equipment, Mixers

Find More Local Projects

Within 75 Miles of This Project
446
Active Projects
252
Bidding Soon
4,254
All Active Projects
1,964
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 22, 2023

October 23, 2023

img_map_placeholder

498 Cambria St, Freemansburg, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Freemansburg Park Amphitheater

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.