Published September 11, 2024 at 8:00 PM

Updated October 1, 2024

Site work, paving, outdoor lighting, new construction and renovation of a mixed-use development in South Park, Pennsylvania. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; for outdoor lighting for a sidewalk / parking lot; for the construction of a water / sewer project; for the renovation of a sidewalk / parking lot; and sidewalk / parking lot.

The general description of the Work includes, but is not limited to the following: Contract One - General Construction: This project consists of the construction of a new headworks facility that will house a new coarse and fine screen systems, new influent flow metering devices, new raw sewage pumps and wet well, new grit removal facilities, new screenings and grit washing/compacting equipment, and new grit pumping facilities. Partial demolition of existing secondary clarifiers will be required to create space for new headworks facility. Also included in the project are a new primary clarifier influent distribution system, a new sludge thickener and cover, a new centrifuge for sludge processing and associated sludge conveyance, phosphorus removal equipment and associated building, and odor control equipment. Site work consists of the installation of two new influent sewer lines, general excavation and hauling, site grading, utility and existing site piping relocations and modifications, sidewalks and paving, parking areas, installation of new site piping, and a retaining wall/support system to protect the new facilities from Piney Fork stream. Partial excavation into rock and a structural support system for the new headworks facility will be required. General Contractor is to coordinate closely with the Electrical Contractor and HVAC/Plumbing Contractor. Contract Two - Electrical Work: This Contract consists of the installation of new equipment control panels, motor control centers, raw sewage pump VFDs, disconnect switches and associated conduit and wire. Installation of power/wiring/controls for new processes, odor control, and HVAC equipment. Installation of process control systems, updating existing process control functions. Installation of building and site lighting. Installation of components for upgrades to the existing plant SCADA system that will incorporate the new equipment. Coordination with General Construction Contractor for connection of new equipment provided under Contract One and Contract Three. Contract Three Plumbing/HVAC Work: This Contract consists of Demolition of existing HVAC systems, equipment and piping. Installation of new HVAC systems including unit heaters, make-up air units, air conditioning units, ductwork, fans, and HVAC controls. Installation of new plumbing systems and associated piping/drains. Coordination with General Construction Contractor for connection of new equipment provided under Contract One and Contract Three. Each proposal shall be accompanied by a Bid Bond in the amount of ten percent (10%) of the total bid which will be returned upon award of the Contracts. The successful bidder will be required to furnish a performance bond and labor and material bond at contract initiation for the full amount of the contract. Upon accepted completion of the contracts, the successful bidder will be required to provide a two (2) year maintenance bond for the work performed. This project is being partially funded by PENNVEST funds, and the successful Contractors will be required to follow all PENNVEST contract regulations and reporting as required by PENNVEST regulations. Because of the PENNVEST funding process, Contractors will be required to hold their bid price for a period of up to 120 days to complete the PENNVEST closing. Davis-Bacon wage rates and other federal requirements apply and are included in the bid documents. For steel purchases, Contractors will be required to comply with the purchase of American Iron and Steel (AIS) in accordance with the provisions of the Federal Consolidated Appropriations Act, January 17, 2014, P.L. 113, No. 76, 436, for all construction contracts awarded as part of this project. The Bethel Park Municipal Authority reserves the right to accept or reject any or all bids and to waive any informality in any bids should it consider same to be in its best interest. Bids may not be withdrawn for a period of one-hundred twenty (120) days after date of receiving bids to coincide with the required closing period. All inquiries should be directed to Dan Goodwin, P.E. at 412-334-1637 or dgoodwin@wadetrim.com. Question Deadline 07/24/2024 All questions regarding the Contract Documentsfor this Projectshould be addressed to Dan Goodwin, P.E., at the address above, by phone at (412) 334-1637 or by email at dgoodwin@wadetrim.com.

Post-Bid

Sidewalks / Parking Lot

$300,000.00

Public - City

New Construction, Outdoor Lighting, Paving, Renovation, Site Work

366

51

34

4

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Design Data, Special Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Quality Assurance, Manufacturer Qualifications, Temporary Facilities and Controls, Temporary Utilities, Temporary Electricity, Temporary Controls, Temporary Erosion and Sediment Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Maintenance Data, Bonds, Warranties, Spare Parts, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Reinforcing Steel, Welded Wire Fabric Reinforcing, Cast-in-Place Concrete, Structural Concrete, Post-Tensioned Concrete, Concrete Curing, Precast Concrete, Precast Structural Concrete, Grouting, Mass Concrete
Division 04 - Masonry

Division 04 - Masonry

Masonry, Common Work Results for Masonry, Unit Masonry, Concrete Unit Masonry, Glass Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications, Metal Railings, Metal Gratings
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Wood, Plastics, and Composites, Common Work Results for Wood, Plastics, and Composites, Rough Carpentry, Sheathing, Architectural Woodwork, Wood Paneling, Plastic Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Dampproofing, Thermal Protection, Thermal Insulation, Roofing and Siding Panels, Membrane Roofing, Joint Protection, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Panel Doors, Windows, Aluminum Windows, Bronze Windows, Stainless-Steel Windows, Steel Windows, Roof Windows and Skylights, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Carpeting, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Safety Specialties, Fire Protection Specialties, Fire Extinguishers, Exterior Specialties, Protective Covers
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Other Conveying Equipment, Facility Chutes
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Plumbing Equipment, Domestic Water Filtration Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, HVAC Fans, Air Outlets and Inlets, Central HVAC Equipment, Decentralized HVAC Equipment, Decentralized Unitary HVAC Equipment, Convection Heating and Cooling Units, Air Coils, Unit Heaters
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Circuit Protective Devices, Fuses, Low-Voltage Controllers, Variable-Frequency Motor Controllers, Facility Electrical Power Generating and Storing Equipment, Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Fine Grading, Excavation and Fill, Subgrade Preparation, Excavation, Trenching, Dewatering, Fill, Backfill, Trenching and Backfilling, Embankments, Erosion and Sedimentation Controls, Shoring and Underpinning, Shoring, Sheet Piling, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Aggregate Surfacing, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Turf and Grasses, Seeding, Sodding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Fuel Distribution Utilities, Natural-Gas Distribution, Electrical Utilities, Utility Substations, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration, Gas and Vapor Process Piping
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Conveyors, Piece Material Handling Equipment, Cranes and Hoists, Lifting Devices, Clamps, Mobile Plant Equipment, Trucks, Flatbed Trucks
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Gas Handling Equipment, Gas Compressors, Liquid Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
115
Active Projects
74
Bidding Soon
1,015
All Active Projects
454
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 31, 2024

August 30, 2024

img_map_placeholder

3100 Piney Fork Rd, South Park, PA

Related To This Project


Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

2021 WWTP Grit and Headworks Improvements Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.