Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 20, 2025 at 8:00 PM
Updated September 21, 2025
Site work, paving and outdoor lighting for a mixed-use development in Richland, Washington. Working plans call for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
https://www.tri-cityherald.com/news/local/article311320225.html What is Richland’s Downtown Loop project? By Bob Brawdy July 25, 2025 at 4:50 AM The Downtown Loop, aka “couplet,” is Richland’s ambitious plan to revitalize the central business district by converting George Washington Way and Jadwin Avenue into one-way streets. The city is going public now with its plan in a bid to build public support for the $25 million, 18-month project. Read more at: https://www.tri-cityherald.com/news/local/article311320225.html#storylink=cpy __________________________ Reconfiguring george washington way, jadwin ave, and symons street to one-way couplet streets implementing a road diet, repurpose road width for buffered-protected bike lanes, wider sidewalks, on-street parking, bump-outs, pavement markings, signage and converting intersections to single approach. Lighting, including pedestrian-scale lighting, is included to provide specific safety benefits to active transportation users. Includes traffic signal changes throughout the corridor, signal coordination, bicycle and pedestrian enhancements at intersections, and pedestrian hybrid beacons. Also, includes modifications to cross-streets jadwin ave, lee blvd, knight street, mansfield st, newton st, swift blvd, guyer ave, gowen ave, kadlec way, williams blvd, hains ave, haupt ave, hunt ave, stanley street and symons ave. Nhpp funds will fund milling, overlay and pavement repair on central george washington way, bradley boulevard to guyer avenue. County: Benton Agency: Richland Total Project Length :1.300 Begin Termini :Torbett St. End Termini :Torbett St. As of September 20 , 2025, the project is in Final Planning status. Anticipated letting Year is 2025. WADOT - Downtown Connectivity Improvements *Project information has been obtained through a public transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Final Planning
Roads / Highways
$24,149,115.00
Public - State/Provincial
Outdoor Lighting, Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 1, 2025
George Washington Way, Richland, WA
Related To This Project
Richland, WA
--
Richland, WA
Bid Date: Mar 10 2025
Richland, WA
Bid Date: Mar 31 2025
Richland, WA
Bid Date: Feb 27 2025
Richland, WA
Bid Date: Mar 18 2025
Richland, WA
Bid Date: May 01 2025
Richland, WA
Bid Date: Mar 18 2025
Richland, WA
Bid Date: Apr 02 2025
Richland, WA
Bid Date: Feb 25 2025
Richland, WA
Bid Date: Feb 24 2025
Richland, WA
Bid Date: Feb 14 2025
Richland, WA
Bid Date: Jul 25 2019
Richland, WA
Bid Date: Feb 05 2025
Richland, WA
Bid Date: Jan 29 2025
Richland, WA
Bid Date: Feb 04 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
