BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 20, 2025 at 8:00 PM

Updated September 21, 2025

Site work, paving and outdoor lighting for a mixed-use development in Richland, Washington. Working plans call for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

https://www.tri-cityherald.com/news/local/article311320225.html What is Richland’s Downtown Loop project? By Bob Brawdy July 25, 2025 at 4:50 AM The Downtown Loop, aka “couplet,” is Richland’s ambitious plan to revitalize the central business district by converting George Washington Way and Jadwin Avenue into one-way streets. The city is going public now with its plan in a bid to build public support for the $25 million, 18-month project. Read more at: https://www.tri-cityherald.com/news/local/article311320225.html#storylink=cpy __________________________ Reconfiguring george washington way, jadwin ave, and symons street to one-way couplet streets implementing a road diet, repurpose road width for buffered-protected bike lanes, wider sidewalks, on-street parking, bump-outs, pavement markings, signage and converting intersections to single approach. Lighting, including pedestrian-scale lighting, is included to provide specific safety benefits to active transportation users. Includes traffic signal changes throughout the corridor, signal coordination, bicycle and pedestrian enhancements at intersections, and pedestrian hybrid beacons. Also, includes modifications to cross-streets jadwin ave, lee blvd, knight street, mansfield st, newton st, swift blvd, guyer ave, gowen ave, kadlec way, williams blvd, hains ave, haupt ave, hunt ave, stanley street and symons ave. Nhpp funds will fund milling, overlay and pavement repair on central george washington way, bradley boulevard to guyer avenue. County: Benton Agency: Richland Total Project Length :1.300 Begin Termini :Torbett St. End Termini :Torbett St. As of September 20 , 2025, the project is in Final Planning status. Anticipated letting Year is 2025. WADOT - Downtown Connectivity Improvements *Project information has been obtained through a public transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Final Planning

Roads / Highways

$24,149,115.00

Public - State/Provincial

Outdoor Lighting, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
48
Active Projects
21
Bidding Soon
402
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 1, 2025

Project location map

George Washington Way, Richland, WA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.