BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 20, 2025 at 7:00 PM

Updated January 21, 2025

Site work and paving for a civil project in Fennville, Michigan. Completed plans call for site work for a road / highway; for paving for a road / highway; bridge / tunnel; and bridge / tunnel.

Bridge rehabilitation including epoxy overlay, deck patching, barrier patching, substructure patching, full depth deck patching (R03 only), slope paving repair, expansion joint replacement, resealing end joints, substructure horizontal surface sealer, PCI beam repairs with FRP wrapping and overcast, temporary supports, clean and coat bearing plates, HMA patch removal, false decking, silane treatment and install pressure relief joints (R03 only) and approach work on I-196 over CSX Railroad, Allegan County. 6% Dbe Participation Required Net classification required for this project is 2850 N9-1A In addition to the above minimum prequalification requirement for prime contractors this project includes a subclassification of Fa. If the prime contractor is not prequalified in this subclassification it must use a prequalified subcontractor. This subcontractor must be designated prior to award of the contract to the confirmed low bidder. Control Sec Job No Federal No BFPI 03035 214956A 25A0172 Completion Date: 11/3/2025 MI DOT - 2501 002 - Bridge Rehabilitation Including Epoxy Overlay, Slope Paving Repair, Expansion Joint Replacement, HMA Patch Removal, False Decking on I-196

Award

Bridges / Tunnels

$2,819,479.00

Public - State/Provincial

Paving, Site Work

83

8

5

7

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
28
Active Projects
0
Bidding Soon
703
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 10, 2025

April 15, 2025

Project location map

I-196, Fennville, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.