BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 21, 2025 at 8:00 PM

Updated April 22, 2025

Site work and paving for a road / highway in Redmond, Oregon. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The first-tier subcontractor list is required to be submitted by 4:00 PM, same day.(Note: The first-tier subcontractor list may also be submitted with the sealed Bid at the Contractors preference). Question Deadline 02/26/2025 Issuing Officer for the Project is Tina Kircher, Procurement & AP Specialist, Office Phone (541) 504-2050. Issuing Officer shall be contacted regarding any questions relating to this Invitation to Bid. All technical questions shall also be directed to the Issuing Officer. City must receive requests for changes in writing a minimum of seven calendar days prior to the deadline for submitting Bid proposals Bids shall be clearly labeled: City of Redmond, 2025 Slurry & Chip Seal Maintenance. No pre-bid meeting will be held. The 2025 Slurry & Chip Seal Maintenance (Project) is part of the Citys Street Preservation Program. The Project consists of a Type III slurry as part for approximately 320,319 square yards (16 centerline miles) of existing asphalt and chip seal for approximately 2.14 miles and 48,594 square yards. The Project also includes public notification, traffic control, and other work necessary to complete the Project. The City's estimate for Type III Slurry Seal is $864,861 and for Chip Seal is $193,405 for a total Project estimate of $1,058,266. The 2025 Slurry & Chip Seal Maintenance (Project) is part of the Citys Street Preservation Program. The Project consists of a Type III slurry as part for approximately 320,319 square yards (16 centerline miles) of existing asphalt and chip seal for approximately 2.14 miles and 48,594 square yards. The Project also includes public notification, traffic control, and other work necessary to complete the Project. The Citys estimate for Type III Slurry Seal is $864,861 and for Chip Seal is $193,405 for a total Project estimate of $1,058,266. All workmanship, materials, and conditions shall conform to applicable construction codes, any special provisions included in these documents, issued addendums, the General Conditions, Special Provisions, Redmond Standards & Specifications 2024 and any Supplementary Conditions

Award

Roads / Highways

$1,048,325.00

Public - City

Paving, Site Work

4

3

4

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
26
Active Projects
16
Bidding Soon
132
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 5, 2025

June 1, 2025

Project location map

Multiple Locations, Redmond, OR


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.