BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 12, 2025 at 8:00 PM

Updated June 11, 2025

This is a service / maintenance or supply contract in Lakeland, Georgia. Contact the soliciting agency for additional information.

The City of Lakeland is requesting the service of a qualified contractor to investigate and record service line materials using vacuum excavation. Bidder agrees to furnish all materials and equipment and to perform all labor necessary to pothole and identify the existing service line material on 1,534 metered services. Contractor will be required to enter the data into ESRI's ArcGIS Online (AGOL) GIS Platform using a license provided by the Owner and Engineer with an iOS or Android Mobile Device. No Bid may be withdrawn after the closing time for the receipt of Bids for a period of sixty (60) days except as specifically provided in the Instructions to Bidders and/or by State Law. Time allotted for completion of work is 180 calendar days from the date of a written "Notice to Proceed" from Owner. All Work shall be completed in accordance with the specifications. The Work will be awarded in one (1) Contract. Bidders must complete the Qualifications of Bidders (Section 00470) in order to be evaluated for award of the Contract. Refer to the specific requirements outlined in the referenced Section. Bids shall be accompanied by a bid bond or certified cashier's check in an amount not less than 10% of the base bid. All bonds shall be by a surety company licensed in Georgia with an "A" minimum rating of performance and a financial strength of at least five (5) times the contract price as listed in the most current publication of "Best's Key Rating Guide Property Liability". Performance and Payment Bonds, each in an amount equal to 100% of the contract price shall be required of the successful bidder if contract is awarded. Each Bond shall be accompanied by a "Power of Attorney" authorizing the attorney-in-fact to bind the surety and certified to include the date of the bond. Owner reserves the right to reject any or all Bids, including without limitation, the rights to reject any or all nonconforming, nonresponsive, unbalanced or conditional Bids and to reject the Bid of any Bidder if Owner believes that it would not be in the best interest of the Project to make an award to that Bidder, whether because the Bid is not responsive or the Bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria established by the Owner.

Post-Bid

Water / Sewer

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
32
Active Projects
6
Bidding Soon
357
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 10, 2025

July 10, 2025

Project location map

Multiple Locations, Lakeland, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.