Published June 11, 2025 at 8:00 PM

Updated June 12, 2025

Site work and new construction of a warehouse / distribution facility in Viroqua, Wisconsin. Conceptual plans call for the construction of a warehouse / distribution facility; and for site work for a warehouse / distribution facility.

Vernon County is requesting proposals for design services and construction materials to construct a new Storage Facility located in Viroqua, Wisconsin. The storage facility will house County vehicles and equipment. Building Design for a 50’ x 100’ x 16’ building: • Design should be for building, concrete, and HVAC to be able to meet State approval Building Material Minimums: • 2” x 6” 3 ply columns 4’ on center • 2” x 6” girts 2’ on center • 2” x 6” bottom plate; double 2” x 6” top plate • Hold downs for each column • Roof Trusses with 3/12 slope pitch; 4’ on center • Exterior Steel, 29 gauge minimum • Roof Steel; 29 gauge minimum • Interior Ceiling; 29 gauge minimum • Interior Walls; 29 gauge minimum • R-19 batt insulation for interior walls • R-50 Blown in insulation in attic with attic divider • 2’ vented overhang • 4 – 14’ x 14’ Overhead garage doors; insulated 2” minimum with openers • 3- Service doors with 42” wide opening Concrete: • Concrete floor with of 5” with 4,000psi rating to include rebar with 2” rigid foam underneath with floating slab with perimeter grade beam. Concrete should also include a 10’ x 100’ apron • 6” Bollards to protect garage door openings Construction of Building: • To comply with State approved plans and design June 2025 HVAC: • To comply with State Approved plans and design • Hanging furnace with option for in floor heat Electrical: • To comply with building design and plans • Transfer switch for future generator • 3 phase inverter Plumbing: • Water and Sewer connection to building from municipal source • Water line stub in within building Optional: • Cost for 8’x8’ bathroom to include sink and toilet • 6’x12’ concrete pad for future generator If additional information is necessary to assist the vendor in interpreting this RFP, questions will be accepted by: Vernon County Building’s Supervisor, 1335 Railroad Avenue, Viroqua, WI 54665. (608) 637-5452 or phil.hewitt@vernoncountywi.gov Consultants are expected to raise any questions, exceptions or additions they have concerning the RFP document at this point in the RFP process. Questions are due by June 24th at 4:30pm. Vernon County reserves the right to terminate the selection process at any time and reject any or all offers. The County shall not be liable for any pre-contract costs incurred by interested firms participating in the selection process.

Conceptual

Warehouse / Distribution

$909,000.00

Public - County

New Construction, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
22
Active Projects
1
Bidding Soon
453
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 28, 2026

Project location map

1212 Railroad Ave, Viroqua, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.