BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 8, 2025 at 8:00 PM

Updated September 9, 2025

Renovation of a mixed-use development in Keyser, West Virginia. Working plans call for the renovation of a educational facility; and library.

** Project canceled. Re-bid details to follow. Building and Facility Construction and Maintenance Services Structures and Building and Construction and Manufacturing Components and Supplies Heating and ventilation and air circulation Building and facility maintenance and repair services. West Virginia University on Behalf of Its Board of Governors ("Bog") Located in Morgantown, West Virginia ("Wvu" or "University") is Initiating This Request for Bids ("Rfb") From Qualified, Experienced, and Licensed Contractors to Preform Removal and Replacement of Boilers for the Administration Building and Mary F. Shipper Library Located on the Campus of Potomac State College in Keyser, Wv. Required documentation must be submitted under SUPPLIER ATTACHMENTS with Response (bid bond, drug-free affidavit, etc.). The Contractor shall achieve Substantial and Final Completion of the entire Work as calculated or indicated below. The date of issuance of the West Virginia University's Notice to Proceed and/or Contact shall be used to calculate Substantial and Final Completion. a. Substantial Completion shall be: 60 days upon execution of a contract b. Final Completion shall be: 30 days following Substantial Completion c. Final Completion shall be when project site is de-mobilized and all project documents listed in Close-Out section of the specifications has been sent to the Owner. Liquidated Damages :1. The Contractor shall achieve Substantial and Final Completion of the entire Work as calculated or indicated above. The date of issuance of the West Virginia University's Notice to Proceed or Executed Agreement shall be used to calculate Substantial and Final Completion of contract time stated in number of consecutive calendar days or established date. Time is of the essence. a. Liquidated Damages shall be Five Hundred Dollars ($500) per Calendar Day of delay in achieving Substantial Completion and Two Hundred and Fifty Dollars ($250) per Calendar Day of delay in achieving Final Completion. Question Deadline 07/16/2025 at 1:00 PM ET Questions must be submitted directly electronically

Final Planning

Educational

$200,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

15

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
192
Active Projects
71
Bidding Soon
1,330
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 9, 2026

March 11, 2026

Project location map

101 Fort Ave, Keyser, WV

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.