Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published December 19, 2025 at 7:00 PM
Updated December 20, 2025
Site work and new construction of a fire / police facility in Melrose, Massachusetts. Completed plans call for the construction of a fire / police facility; and for site work for a fire / police facility.
Request for GENERAL and TRADE CONTRACTOR Qualifications for Melrose Police Station project. NOTE: The previous RFQ for this Project was cancelled. This is a new solicitation. Construct a new approximately 26,000 SF Police Station and associated site work. Project consists of two stories with vehicle bays, garage, holding cells, administration area, dispatch center, fitness center and offices. Estimated total project duration is 16-18 months. Estimated Cost $27 million Contractor Qualification DCAMM Certificate Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. Trade Contractor Statement of Qualifications Forms from interested trade subcontractors are sought for the following categories of work: Masonry (ECC $1,492,000), Miscellaneous & Ornamental Iron (ECC $351,000), Waterproofing, Dampproofing & Caulking (ECC $240,000), Roofing & Flashing (ECC $988,000), Metal Windows (ECC $408,000), Glass & Glazing (ECC $37,000), Tile (ECC $223,000), Acoustical Ceiling Tile (ECC $113,000), Resilient Floors (ECC $90,000), Painting (ECC $173,000), Elevators (ECC $150,000), Fire Protection ($346,000), Plumbing (ECC $838,000), HVAC (ECC $2,147,000), & Electrical (ECC $2,953,000). Only prequalified General and Trade firms, who are prequalified by the Awarding Authority, will be invited to submit a bid for the Building Project pursuant to M.G.L. c. 149, 44E. The Owner's Project Manager is The Vertex Companies, LLC and the Project Designer is Dore + Whittier. Sub Bid Category Masonry, Misc. Metals, WD&C, Roofing & Flashing, Metal Windows, Glass, Tile, ACT, Resilient Floors, Painting, Elevators, Fire Protect, Plumbg, HVAC, Elec Construction of a new 27,000 SF Police station building located on the current Beebe school site adjacent to the Milano Family Senior center and the Beebe estate in Melrose, MA. Along with the construction of the new all electric LEED Certified building, work includes: demolition of the existing concrete & masonry school building structure, complete site redevelopment & utilities infrastructure work, construction in & along West Foster Street. Scope also includes coordination with existing / new site utilities; complete new E911 / police dispatch center; detainee processing, detention, monitoring areas; secure evidence storage areas; command and administrative staff areas, as well as a series of both public and staff only secured spaces. The construction duration is approximately 16-18 Months.
Post-Bid
Fire / Police
$27,000,000.00
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
