BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 30, 2025 at 8:00 PM

Updated October 31, 2025

Demolition, site work, paving and addition to a mixed-use development in Avoca, Pennsylvania. Completed plans call for the addition of a transportation facility; for the demolition of a transportation facility; for site work for a transportation facility; road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Project generally includes the following work items: o Selective demolition of interior and exterior building elements at interface between existing terminal building and addition. o Demolition of airside pavements and relocation of existing utilities within project footprint. o Construction of a terminal building expansion that houses a new exit lane, secure and non-secure waiting areas, a business center, and a screening/security office. o Installation of new mechanical equipment and systems. o Reconstruction of airside pavements and sidewalks in demolished areas. o Installation of pavement markings and column protection to delineate new baggage tug route The following separate contracts are herewith advertised for bids: o General Construction o Mechanical Construction o Electrical Construction o Plumbing Construction Question Deadline 10/24/2025 at 12:00 PM ET From the time of advertising until the actual bid opening for this Contract, all prospective Bidders, Contractors, Subcontractors, and Suppliers shall direct all technical inquiries related to this project to Mr. Chad Phillips, Project Manager, McFarland Johnson, Inc., 802-862-9381, or cphillips@mjinc.com. All bids must be accompanied by a Proposal Surety (Bid Bond or other instrument as described in the Instructions to Bidders) in the amount of five percent (5%) of the amount of the bid. Minimum hourly wage rates shall be paid per the wage rate determinations of the Federal Davis-Bacon Wage Rate Act. The Disadvantaged Business Enterprise overall participation goal for Wilkes-Barre/Scranton International Airport is 4.28%: as determined by PennDOT Bureau of Aviation. Contractors shall make a good faith effort to employ minorities and women businesses as part of the project work. Wilkes-Barre/Scranton International Airport does not discriminate on the basis of race, color, national origin, sex, religion, age, disability or familial status in employment or the provision of services. Wilkes-Barre/Scranton International Airport is an Equal Opportunity/Affirmative Action Employer. The project is being funded in part by the Federal Aviation Administration's (FAA) Infrastructure Investment and Jobs Act (IIJA), and the Pennsylvania Department of Transportation Bureau of Aviation. However, due to the timeline of FAA funding, the project construction work may not commence until the Spring of 2026. The Wilkes-Barre/Scranton International Airport reserves the right to reject any and all bid Proposals, to waive any informality in bid Proposals received, and to make awards in the best interest of Luzerne and Lackawanna Counties. ** Bid date info : All bid Proposals shall be delivered to the Wilkes-Barre/Scranton International Airport at the above listed address with the following information clearly labeled on the outside of an opaque, sealed envelope: "Bid for Wilkes-Barre/Scranton International Airport - Terminal Expansion", Legal name and mailing address of the bidder. When sent by mail, preferably registered, the sealed proposal, marked as indicated above, should be enclosed in an additional envelope. Bid proposals must be submitted in duplicate (one original and one exact copy). No bidder may withdraw their bid within 120 calendar days after the actual date of the opening thereof. Bid Result General Construction - D & M Construction - 9,617,000 Mechanical Construction - Scranton Electric Heating & Cooling Service, Inc- 903003 Electrical Construction - Joyce Electrical Inc - 431,000 Plumbing Construction - Scranton Electric Heating & Cooling Service, Inc - 428,236

Bid Results

Transportation Terminals

$11,379,239.00

Public - State/Provincial

Addition, Demolition, Paving, Site Work

184

35

64

5

Subscribe For Documents

83 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
358
Active Projects
140
Bidding Soon
1,994
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 29, 2025

November 28, 2025

Project location map

100 Terminal Drive, Avoca, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.