BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 9, 2025 at 7:00 PM

Updated December 10, 2025

Site work and new construction of a power facility in Benton Harbor, Michigan. Design plans call for the construction of a one-story above grade power facility.

Solar and Energy Storage Installations.The city is seeking proposals from qualified bidders to create a comprehensive, feasible solar design plan for the city and prepare one bid-ready proposal, which will include three individual bid components for three specific sites to implement the plan. All bid proposals must be submitted in a clearly marked envelope or by email on or before the specified deadline. The cost of preparing proposals is an operational cost of the proposer and will not be borne by the city. The city reserves the right to accept or reject any or all proposals, waive technicalities, or accept the proposal that best serves the city's interest. Create a comprehensive, feasible, solar design plan for the City that: Provides solar production at three (3) city-owned sites City Hall/Public Safety at 200 E. Wall St., Benton Harbor, MI 49022; Bobo Brazil Community Center at 472 Cass St., Benton Harbor, MI 49022; and Benton Harbor Water Filtration Plant at 601 Ridgeway St., St. Joseph, MI 49085 in compliance with all federal, state, and local laws and regulations

Design

Solar Power Generation

$2,000,000.00

Public - City

New Construction, Site Work

5

2

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
329
Active Projects
130
Bidding Soon
2,589
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 12, 2025

February 2, 2026

Project location map

To be determined, Benton Harbor, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.