Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 14, 2026 at 8:00 PM
Updated May 20, 2026
Site work and paving for a mixed-use development in Viroqua, Wisconsin. Completed plans call for site work for a sidewalk / parking lot; road / highway; water / sewer project; for paving for a sidewalk / parking lot; and road / highway.
As of April 14, 2026 project was awarded to Gerke Excavating Inc, awarded amount is $664,300.30 The Project consists of sanitary sewer, water main, and storm sewer system replacement and street reconstruction on Adams Street. Bids will be received for a single prime Contract. Bids shall be on a lump sum and unit price basis, with additive alternate bid items as indicated in the Bid Form. The work is subject to the provisions of Sections 61.54, 62.15, 66.0901, and 66.0903(1m) of the Wisconsin Statutes. The Project is funded in part with funds from the Wisconsin Department of Natural Resources Safe Drinking Water Loan Program (SDWLP) and the Wisconsin Department of Natural Resources Clean Water Fund Program (CWFP). Conformance with the American Iron & Steel (A.I.S.) and associated SDWLP and CWFP requirements are required. Minimum salaries and fringes to be paid on the Project shall be in accordance with the prevailing wage rate determination established by the Federal Department of Labor (DOL). Requirements as to conditions of employment and minimum wage rates to be paid under contract, Section 3, Segregated Facility, Section 109 and E.O. 11246 apply. Federal Labor Standards program laws, including the Davis-Bacon Act, the Copeland Anti-Kickback Act, and the Contract Work Hours and Safety Standards Act will apply. The Village of La Farge encourages Minority-owned Business Enterprises (MBE's), Women's Business Enterprises (WBE's), Disadvantaged Business Enterprises (DBE's), and Small Businesses in Rural Areas (SBRA's) to submit bids. A good faith effort to achieve a combined minimum goal of participation for MBE WBE utilization in accordance with s.NR 162.09(3), Wis. Admin. Code is required. No proposal will be accepted unless accompanied by a certified check or bid bond equal to at least five percent (5%) of the amount bid, payable to the OWNER as a guarantee that, if the bid is accepted, the Bidder will execute and file the proper contract and bond within 15 days after the award of the contract. Bids may not be withdrawn within 90 days after the date of the bid opening. The OWNER reserves the right to increase or decrease the quantity of any item or portion of the work, or to omit portions of the work, as may be deemed necessary by the OWNER, and the same shall in no way affect or make void the contract, except that additions to, or deductions from, the contract price will be appropriately made. The OWNER reserves the right to waive any informalities, or to reject any or all bids, or any part of a bid, and to award the Contract to the Bidder, who in the judgment of the OWNER, will best serve the interest of the OWNER. A. Written inquiries shall be mailed or hand delivered to Mark Digman, P.E., Delta 3 Engineering, Inc., 875 S. Chestnut Street, Platteville, Wisconsin, 53818. B. Electronic inquiries shall be emailed to the following email address: markdigman@delta3eng.biz with the subject line Proposed 2026 Infrastructure Improvements - Adams Street. Questions received less than three days prior to the date for opening of Bids may not be answered. CONTRACTS: Contract #1 - Utility and Street Construction 1. Contract #1: a. Location: 1) Adams Street from N. Mill Street to Lakeview Dr/Bird Street. b. Description of Work to be completed: Full street reconstruction and replacement of utilities. Work includes: 1) Traffic control. 2) Installation and maintenance of erosion control measures. 3) Clearing and grubbing. 4) Installation of sanitary sewer, manholes, and appurtenances. 5) Installation of water main, hydrants, and appurtenances. 6) Installation of storm sewer, inlets, manholes, and appurtenances. 7) Street reconstruction: a) Excavation of street, sidewalks, driveways, etc. b) Placement of subgrade reinforcement. c) Placement of select crushed material. d) Placement of crushed aggregate base course. e) Installation of curb and gutter. f) Installation of concrete sidewalks. g) Placement of HMA pavement.
Award
Water / Sewer
$664,300.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 5, 2026
July 6, 2026
Adams St, Viroqua, WI
Related To This Project
Viroqua, WI
Bid Date: Mar 23 2026
Viroqua, WI
Bid Date: Mar 23 2026
Viroqua, WI
Bid Date: Mar 23 2026
Viroqua, WI
Bid Date: Mar 23 2026
Viroqua, WI
Bid Date: Mar 23 2026
Viroqua, WI
Bid Date: Mar 23 2026
Viroqua, WI
Bid Date: Mar 23 2026
Viroqua, WI
Bid Date: Apr 16 2026
Viroqua, WI
Bid Date: Feb 12 2026
Viroqua, WI
Bid Date: Mar 06 2026
Viroqua, WI
Bid Date: Mar 06 2026
Viroqua, WI
Bid Date: Jan 29 2026
Viroqua, WI
Bid Date: Jan 29 2026
Viroqua, WI
Bid Date: Jan 14 2026
Viroqua, WI
Bid Date: Jan 14 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
